How does the risk factor affect the spiral model, Software Engineering

Assignment Help:

How does the risk factor affect the spiral model of software development?

Ans: Risk Analysis phase is the most significant part of "Spiral Model". In this phase all possible (and available) alternatives, which can help in developing a cost effective project are examined and strategies are decided to use them. This phase has been added specially in order to verify and resolve all the possible risks in the project development. If risks indicate any type of uncertainty in needs, prototyping may be used to proceed with the available data and search out possible solution in order to deal with the potential changes in the requirements

 


Related Discussions:- How does the risk factor affect the spiral model

Differentiate between failures and faults, Differentiate between failures a...

Differentiate between failures and faults.   Failure:- Failure is the departure of external results of program operation from requirements. So failure is dynamic. Failure can

What is a user friendly document, What is a user friendly document? Ans)...

What is a user friendly document? Ans) A document is user friendly, when it is designed and written with simple of use, as single of the primary objectives of its design.

What is data binding, What is Data Binding?    The matrix that attempts...

What is Data Binding?    The matrix that attempts to capture the module-level concept of coupling is data binding. Data binding are a calculate that captures the data interacti

What is function points, A consistent measure of software size based on use...

A consistent measure of software size based on user needs.

How to compute the cyclomatic complexity, How to compute the cyclomatic com...

How to compute the cyclomatic complexity? The cyclomatic complexity can be computed by any one of the following ways. 1. The numbers of regions of the flow graph correspond

How to perform risk analysis during software testing, Describe how to perfo...

Describe how to perform Risk Analysis during software testing. Whereas a test plan is being formed, risks involved in testing the product are to be taken into consideration al

State about the build and fix model, Build and Fix Model It's a simple...

Build and Fix Model It's a simple two phase model. In one phase, code is developed and in another, code is fixed. Figuredepicts the Build and Fix model.

Information storage and retrieval software, INFORMATION STORAGE  AND RETRI...

INFORMATION STORAGE  AND RETRIEVAL SOFTWARE: IBM (International Business Machines Corporation) was one of the earliest to invest money to develop software packages intended fo

What is system simulation, What is System Simulation? Normal 0 ...

What is System Simulation? Normal 0 false false false EN-IN X-NONE X-NONE MicrosoftInternetExplorer4

What are the two levels of testing, What are the two levels of testing? ...

What are the two levels of testing? i. Component testing Individual works are tested. Tests are derived from developer's experience. ii. System Testing The group o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd