How do you determine specific gravity of cement, Civil Engineering

Assignment Help:

Cement is usually purchased as a powdery substance that is mixed with sand, aggregate, gravel, and water to form concrete. As the cement itself is usually a powder, it is hard to calculate a standard value for its particular gravity. In addition, as cement is usually not used by itself, knowing its particular gravity is not particularly useful.

 


Related Discussions:- How do you determine specific gravity of cement

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Common building stones, Common Building Stones Here describe some commo...

Common Building Stones Here describe some commonly used stones are following: a. Granite       b. Basalt and trap c. Slate          d. Sand stone   e. Marble        f.

What are the uses of groynes, They stop, or slow down erosion, and stop lon...

They stop, or slow down erosion, and stop long shore drift. This, though, can have bad knock-on effects somewhere near.

What is dead weight, Dead weight Dead loads are the weight of perma...

Dead weight Dead loads are the weight of permanent components of the structures such as the weight of the elements and spheres, casing weight, weight of the false ceiling a

Advantages and disadvantages of water transport, Advantages and Disadvantag...

Advantages and Disadvantages of Water Transport: The following are the advantages of water transport: (a)        Since the vessels travel on water, no investment is needed

Wearing course or additional thickness be designed on piers, Question S...

Question Shall layer of wearing course or additional thickness be designed on surface of piers ? Answer In designing of piers , considerations have to be given to

Chain surveying, Explain me about obstacles in chain surveying and what is ...

Explain me about obstacles in chain surveying and what is meant by cross staff,offsets?

Determine the geometrical parameters for layout, Q. A crossover is to be la...

Q. A crossover is to be laid between two parallel B. G. tracks at 4.725 m centers by using 52 kg, 1 in 8½ and 1 in 12 turnouts. For this layout, i. Determine the main geometrica

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Staircase, The Figure 1 below shows a section through a stairway for a gara...

The Figure 1 below shows a section through a stairway for a garage in a new proposed dwelling. The stairway is 3 meters wide with 300 mm wide treads(7 treads) and 170 mm high riser

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd