Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. How can you implement Permeability test
As already defined, permeability of porosity of the moulding sand is the message of its ability to permit air to flow through it. It is measured in terms of "Permeability number." In this test, a test specimen of moulding sand (50.8 mm dia. × 50.8 mm long) is placed in a tube. Time taken for 2000 cm3 of air at a pressure of 10 g/cm3 to pass through the specimen is noted. Then, the permeability number is given as:
P = V × h
p ×A× t
Where, P = Permeability number
V = Volume of a air passing through test
Specimen
h = Height of specimen p = Pressure of air
A = Cross-sectional area of specimen
t = time taken by air to flow through the
Under standard conditions, the formula becomes
P = 2000 × 5.08
10 × ?/4 × (5.08)2 × t
= 50.128/t
Construct a plain scale: The distance between Indore and Bhopal is 180 kilometer. It is represented on the map via 9 centimeter. Construct a plain scale for such map, illustra
What'' is balancing and vibration in machines Need of balancing? Causes of vibration and their harmful effects and remedies?
(Hydrostatic pressure on curved 3-D surfaces) A shark tank in the aquarium has a hemispherical glass viewing "bubble" jutting into the water from the side wall. The radius of
How kleins construction method is different from other type of graphical method
fire box
What is the difference between a mechanical component and a mechanical part?
Implementation of Material Requirement Planning: The total requirements for a material from an MRP schedule are given in the following table :
(a) Show that all reversible engines operating between the same source and sink will have same efficiency. (b) A reversible heat engine operates between two reservoirs at temper
example on operation sheet?
Sand blasting handling method: On last experiment we had decided to use 3.0 bars as it shown better result. Now we had to investigate the sand blasting handling
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd