How break even analysis helps in solving the problems, Operation Management

Assignment Help:

How Break even Analysis helps in solving the problems.

Break even Analysis assists solving the problems of following:

 (a) What volume of sales will be necessary to cover?

  - A reasonable return of capital in use

 - Ordinary and preference dividends

 - Reserves

(b) To calculate costs and revenues for all possible volumes of output to fix budgeted sales

(c) To get the price of an article to provide the desires profit

(d) To find out the variable cost per unit

(e) To evaluate a number of business enterprises through arranging their earnings in order of magnitude.

The Break Even Point (BEP) can be computed by using the relation as follows:

BEP = F/(1-V/P)

Here F is fixed cost and V is variable cost per unit or total variable cost and here P is the selling price of each unit.


Related Discussions:- How break even analysis helps in solving the problems

Explain operations information systems, Distinguish between management info...

Distinguish between management information systems and operations information systems

Steps in layout planning and design, Steps in Layout Planning and Design ...

Steps in Layout Planning and Design For a given product at a stated volume of production a process most appropriate must be determined. The process that is determined like any

Quality control, power electronic buys 45ohm resistor, standard deviation f...

power electronic buys 45ohm resistor, standard deviation for this register is 4ohm.sample size of n=

Type of process technologies - continuous of flow production, Type of Proce...

Type of Process Technologies - Continuous of Flow Production Continuous of Flow Production: Batch methods are characterized by the irregularity in the way the work is carried

What are the responsibilities of operation manager, 1. What are an operatio...

1. What are an operations manager's responsibilities?  Answer: They design the operation; they plan and control activities by:  1. Developing an operations strategy  2. Un

Define the upper and lower control limits, The overall average on a process...

The overall average on a process you are attempting to monitor is 50 units. the process standard deviation is 1.72. Determine the upper and lower control limits for a mean chart, i

Calculate the expected value, C and S Metal company produces stainless stee...

C and S Metal company produces stainless steel pots and pans. C and S can pursue either of two distribution plans for the coming year. The firm can either produce pots and pans for

#Process design plant locatiom.., Relation with types of manufacturing plan...

Relation with types of manufacturing plant location and layout.?

Scheduling, external factors affecting schedulling

external factors affecting schedulling

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd