Generally bituminous materials are also broadly categorized into two types viz bitumen McAdamsand hot-rolled asphalts. At the time of compaction, increase of temperature causes the reduction of viscosity of binder. The binder behaves as a lubricant among aggregates particles since it is mobile in a fluid state under high temperatures. Internal resistance between the bituminous materials is drastically decreased resulting in the formation of a mixture with better aggregate interlock.

Bitumen McAdamsmostlycomprises continuously graded aggregates. Compaction of this type of bituminous material is eased with an increase of mix temperature as lubricating effect of decreased viscosity of binder helps in the rearrangement of aggregates.  

Aggregate of hot-rolled asphalt aren't well graded. With a rise in mixing temperature, binder would stay unset and mixture has little resistance to compaction.


Related Discussions:- High temperature in laying bituminous pavement

Steel Design Assignment, I have a steel design assignment for my class that...

I have a steel design assignment for my class that will be given to us on Friday at 6 pm and will be due at 10 pm. I was wondering if you guys would be able to help me with that?.

Quality of constraction material ., haw to control quality of constraction...

haw to control quality of constraction material and it''s stage of control, control management, quality of performance ,organization for control

What are the causes of building collapse, The Passage of time is single rea...

The Passage of time is single reason. Buildings also collapse because of weak foundations. Earthquakes, hurricanes and other natural disasters can also damage the structure of the

For the plane area shown determine the first moments, for the plane area sh...

for the plane area shown determine the first moments with respects to the x & y axis & the location of the centroid

Compute the negative skin friction of the pile group, A square pile group o...

A square pile group of 9 piles passes by a recently filled up material of 4.5 m depth. The diameter of the pile is 30 cm and pile spacing is 90 cm centre to centre. If the unconfin

How the bursting tensile forces produced, How the Bursting Tensile Forces p...

How the Bursting Tensile Forces produced These are tensile forces produced due to concentrated longitudinally applied prestressing forces in the end zone of a post-tensioned co

Strength of concrete at the transfer stage, Strength of Concrete at the Tra...

Strength of Concrete at the Transfer Stage Concrete strength in the member at the transfer stage should conform to the design requirements. The frequency of the sampling and t

How to find back bearings?, Example: The following fore bearings were ...

Example: The following fore bearings were observed respectively for lines, AB, BC, CD, DE, EF and FG. Find out their back bearings: (i) 148°                          (ii

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd