High temperature in laying bituminous pavement, Civil Engineering

Assignment Help:

High temperature in laying bituminous pavement

Generally bituminous materials are also broadly categorized into two types viz bitumen McAdamsand hot-rolled asphalts. At the time of compaction, increase of temperature causes the reduction of viscosity of binder. The binder behaves as a lubricant among aggregates particles since it is mobile in a fluid state under high temperatures. Internal resistance between the bituminous materials is drastically decreased resulting in the formation of a mixture with better aggregate interlock.

Bitumen McAdamsmostlycomprises continuously graded aggregates. Compaction of this type of bituminous material is eased with an increase of mix temperature as lubricating effect of decreased viscosity of binder helps in the rearrangement of aggregates.  

Aggregate of hot-rolled asphalt aren't well graded. With a rise in mixing temperature, binder would stay unset and mixture has little resistance to compaction.


Related Discussions:- High temperature in laying bituminous pavement

Road materials, Road Materials Earthwork and pavements constitute a si...

Road Materials Earthwork and pavements constitute a significant part of the cost of a road. Hence it is desirable that thorough investigations be done about the availability o

Theory of structures, haw do you salve a supple supported beam with a sprin...

haw do you salve a supple supported beam with a spring balance

Dynamic force transfer test of shock transmission unit, Define Dynamic Forc...

Define Dynamic Force Transfer Test of Shock Transmission Unit? This test mainly prove the lock up capability of the device. The STU shall be loaded in tension from zero to the

Load bearing capacity of formwork., What is the calculation method of load ...

What is the calculation method of load bearing capacity of formwork material?

Accuracy and range - angle measurement, Accuracy and Range - Angle measurem...

Accuracy and Range - Angle measurement: Accuracy and Range:-Angle measurement:-Most modern total station instruments measure angles by means of electro-optical scanning of ext

Gg, ggggggggggg

ggggggggggg

Stormwater, Design of the stormwater drainage system for the sub-division ...

Design of the stormwater drainage system for the sub-division Work needed: The following tasks require to be performed for the drainage network: Compute stormwater r

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd