Hazard identification in plant layout, Mechanical Engineering

Assignment Help:

Risks associated with identified hazards can be reduced to a reasonable level through the application of good design principles that are focused on integrating safety into the overall considerations of the design process. This is achieved by reducing the probability of occurrence of risk events, conditions and sources, and minimizing their consequences.

Risks are inherent to any human activity and cannot be totally eliminated. The risk management process is based on the systematic identification of hazards and their associated causes in order to define the extent and likelihood of the potential loss.

This is used to prioritize and assign appropriate actions or treatments appropriate to the level of risk. These treatments are then used to reduce the risks to the project. The guiding principle shall be that the project shall be able to demonstrate that risks have been reduced to As Low As Reasonably Practicable (ALARP).

ALARP principles and Cost Benefit Analyses are used to judge the adequacy at each stage of the risk management process and to ensure that the design meets the criterion of maximum protection of the personnel, environment and assets.

The first step should be the elimination of potential hazards by improving the inherent safety of the design concept, subsequently relying on engineering controls, and finally on administrative controls where fundamental design mitigation is not technically or economically feasible.

Hazards in plant facilities can sometimes be exacerbated by the general requirements for the location of the facilities to be remote of inhabited areas. This can on occasions affect support activities due to the location of support services and the nature of the products being handled. These hazards impact on the total life cycle design requirements of a plant; including its construction, installation, its operation and maintenance , and ultimately the de-commissioning and disposal of the plant.

A preliminary risk assessment should be done to determine the level of importance for each potential hazard and associated risks. This should involve key project personnel, and where possible experienced plant operational and maintenance personnel.


Related Discussions:- Hazard identification in plant layout

Design data of screw conveyor with auger, DESIGN FACT DATA: ?A) Torque...

DESIGN FACT DATA: ?A) Torque capacity for traction motor of screw conveyor-1660 N-m. ? B) RPM of Traction motor-115 rpm. ? C) Pressure require for operating the telescopi

Control function in production management, Control Function in Production M...

Control Function in Production Management: Controlling is a sub system of the production system where a part of the output is monitored for feedback signals to give corrective

Determine the elements of the vdafs version 2.0, Determine the Elements of ...

Determine the Elements of the VDAFS version 2.0 Elements of the VDAFS version 2.0 are shown in Table. Curves and surfaces are described with the help of points, set of points

Calculate the magnitudes of the masses, A rotor has the given properties : ...

A rotor has the given properties : If the shaft is balanced by two counter masses located at 100 mm radii and revolving in planes midway of plan 1 and 2 and midway of 3 and

What is euler operators, What is euler operator Once a polyhedron model...

What is euler operator Once a polyhedron model is available one might want to edit it by adding or deleting vertices, edges and faces to create a new polyhedron. These operatio

Wrought al alloys, Wrought Al Alloys This aluminium alloys are acquir...

Wrought Al Alloys This aluminium alloys are acquired by addition of Mn and Mg. The Al-Mn and Al-Mg alloys cannot be heat treated. Al-Mn alloy combines high ductility along wi

Milling, milling machine time calcutation

milling machine time calcutation

Sada, Ask question #ccMinimum 100 words accepted#

Ask question #ccMinimum 100 words accepted#

Draw shear and moment diagrams, Determine the analytical solution for the m...

Determine the analytical solution for the maximum stress of the beam shown; compare with stress results from SolidWorks. Draw shear and moment diagrams and print them from the beam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd