After final PWHT, the hardness of the deposited weld metal and heat affected zone (HAZ) shall be examined. Hardness values shall not exceed 200 BHN. Heat treatment shall be performed, if required to reduce hardness to the specified level, subject to review and approval by WorleyParsons Canada.
On drums, hardness shall be measured one on each of the following welded areas:
a. Circumferential
b. Longitudinal
c. Nozzle
d. Stub
e. Attachment
Hardness test shall be made with a Brinell Testing machine or a portable hardness tester such as a Telebrineller using a 10 mm (3/8") ball.
Submerged arc weld, SAW shall be tested for hardness on the weld and on the HAZ. The values shall not exceed 200 BHN.
Where required value of BHN is not achieved, the fabricator shall perform a retest without any heat treatment whatsoever. If this second test fails to meet the BHN requirement, heat treatment shall be repeated. Methods and procedures for anticipated second heat treatment shall be pre-approved by WorleyParsons Canada.
slip of belt
working principle of land fill bio gas plant
microscopic and macroscopic view points
Power transmission in vehicle
give some best names
Normal 0 false false false EN-IN X-NONE X-NONE MicrosoftInternetExplorer4
Find out power transmitted by belt: A belt is running over pulley of 1.5m diameters at 250RPM. The angle of contact is 120º and coefficient of friction is 0.30. If maximum te
Clutch Free Play Adjustment : A smooth operation of clutch ensures the smooth running of motorcycle; hence it is essential to maintain a proper clutch free play. STEPS
Q. Leak Repair Torquing Procedure? Attempt to tighten only the bolts contained within an arc that includes the leak area plus one or two bolts either side of the leak to the or
Q. What is Stormwater Treatment? Normally, stormwater run-off from process areas needs to be collected and treated before being discharged to land or water. Often, large aerobi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd