ground water, Civil Engineering

Assignment Help:
Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1,240 m3/day. The second well pumps at 850 m3/day. If the aquifer has a transmissivity of 2,000 m 2/day and a storage coefficient of 4 x 10-4,

Related Discussions:- ground water

Grades of concrete, mixing ratio of different type of ready mix concrete.(R...

mixing ratio of different type of ready mix concrete.(RMC)

Determine length of guide bunds, Q. Determine Length of guide bunds? Leng...

Q. Determine Length of guide bunds? Length of a guide bund has to be such that the flow approaching even from behind the guide bund would pass through the bridge with minimum obl

Define facilities that discharge wastewater to a potw, Facilities that disc...

Facilities that discharge wastewater to a publicly owned treatment works? Facilities that discharge wastewater to a POTW (publicly owned treatment works) are known as subject t

Determine the soil shrinkage, Soil at a borrow area has a total unit weight...

Soil at a borrow area has a total unit weight of 120-PCF and a water content of 15 percent.  The soil from the borrow area will be used as structural fill and compacted to an avera

What are some facts about concrete, Actually, drying is not directly linked...

Actually, drying is not directly linked to hardness in concrete. After concrete is poured, putting it in a wet environment by spraying it constantly with water will hasten its hard

Measurements, Explain the concept of average velocity

Explain the concept of average velocity

Concrete, Determine the quantity of materials required per batch and probab...

Determine the quantity of materials required per batch and probable output from a concrete mixing plant of 1200lts capacity. The design per 1000lts of mixed concrete is as follows

Autocad-introduction, Autocad-Introduction Learning to use a CAD syste...

Autocad-Introduction Learning to use a CAD system is similar to learning a new language. It is necessary tobegin with the basic alphabet and learn how to use it correctly and

Explain the methods of underwater inspection, Explain the Methods of Underw...

Explain the Methods of Underwater Inspection? There are three common methods of carrying out underwater inspection of bridge elements. a)  Wading inspection b)  Scuba div

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd