Graphic methods - correlation regression analysis, Operation Research

Assignment Help:

Graphic Methods

a.Scatter Diagram: Scatter  diagram  is a special  type of dot chart.  Under  this methods  the given data are  plotted in  a graph  paper  in the form of  dot. For each  pair of  or x and y values  we plot a dot( or  point) and thus  we obtain  many  dots equal in number of observation. If now these  plotted dotes  or points  show some  trends  either  upwards or downwards then the two variables  ( x and y) are said to  be correlated or otherwise not correlated. If  again  the trend of points  is upwards  moving  from  lower left hand corner to upper right hand corner then correlation is positive  ( r=+1) r is  coefficient  or correlation. On the  other hand if movement is reverse i, e,  dots  move  from  upper  left hand  corner  to lower right  hand corner then correlation  is negative (r= -1). The  idea  will be  clear from  diagram given  below:

1802_Graphic Methods.png

 

                    Positive Correlation                    Negative  Correlation

 

In fig (a) the values  of the two  variable  move in the same  direction the correlation is  positive and r= 1.

 In figure (b) we  find  negative  correlation and r= 1 as the values  move in  reverse direction.

 In figures (c) we dont  get any  trend  lying  and heance it shows  the  absence  of correlation  and r= 0.

 

 


Related Discussions:- Graphic methods - correlation regression analysis

Linear programming, solve the following linear programming problem using si...

solve the following linear programming problem using simplex method maximize z=3x1+2x2 subject to the constraints: x1+x2 x1+x2 x1,x2>=0

International trade, why does south africa regulate int''l trade

why does south africa regulate int''l trade

Linear Programming, A paper mill produces two grades of paper viz., X and Y...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

HOMEWORK, A company uses 4 pounds of resource 1 to make each unit of X1 and...

A company uses 4 pounds of resource 1 to make each unit of X1 and 3 pounds of resource 1 to make each unit of X2. There are only 150 pounds of resource 1 available. Which of the fo

Cost, Six Operators are to be assigned to five jobs with the cost of assign...

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

Uncertainly, Uncertainly : There is a great uncertainly about economic a...

Uncertainly : There is a great uncertainly about economic and general environment. With economic growth uncertainty is also growing's. this makes each decisions costlier

Purchasing power of customers, This is determined by disposable personal ...

This is determined by disposable personal income( personal income minus direct taxes and other deductions ). Some people suggest the use of discretionary income in place of

Solve by simplex method, Solve by simplex method Maximize Z = 5...

Solve by simplex method Maximize Z = 5x 1 + 3x 2 Subject to 3x 1 + 5x 2 ≤ 15 5x 1 + 2x 2 ≤ 10 &         x 1 ≥ 0, x 2  ≥ 0 [Ans. Max Z = 235/19

#transportation and linear models.., #what is the similarity and difference...

#what is the similarity and differences between transportation and linear programing models?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd