Graph has a minimum spanning tree already computed, Computer Engineering

Assignment Help:

Assume that a graph has a minimum spanning tree already computed.  How fastly can the minimum spanning tree be updated if a new vertex and incident edges are added to G?

If the new vertex and the latest edges are not forming a cycle on the MST, pick up the least edge from the set of new edges. If the new vertex and the corresponding edges are producing cycle on the MST break the cycle by removing the edge with main weight. This will update the minimum spanning tree.

 


Related Discussions:- Graph has a minimum spanning tree already computed

Determine the block diagram of bcd adder, Determine the block diagram of bc...

Determine the block diagram of bcd adder To add 0110 to binary sum, we use a second 4-bit binary adder. The two decimal digits, together with input-carry, are first added in to

What is meant by opening a data file, What is meant by opening a data file ...

What is meant by opening a data file A data file is a file that can be read from or written to. Data files are particularly useful when large amounts of data are involved. Each

What does the ''suppress dialog'' do, What does the 'SUPPRESS DIALOG' do? ...

What does the 'SUPPRESS DIALOG' do? Suppressing of whole screens is possible with this command.  This command permits us to perform screen processing "in the background".  Sup

Explain working of digital camera, Q. Explain working of Digital camera? ...

Q. Explain working of Digital camera? A Digital camera is a camera which captures and stores still images and video (Digital Video Cameras) as digital data in place of on photo

What is inode, What is 'inode'? All UNIX files have its description kep...

What is 'inode'? All UNIX files have its description kept in a structure called 'inode'. The inode have info about the file-size, its location, time of last access, time of las

3D rotation, Magnify a triangle with vertices A = (0,0), B = (3,3) and C = ...

Magnify a triangle with vertices A = (0,0), B = (3,3) and C = (6,4) to twice its size in such a way that A remains in its original position.

Determine the analog output voltage of 6-bit DAC, Determine the analog outp...

Determine the analog output voltage of 6-bit DAC (R-2R ladder network) with Vref as 5V when the digital input is 011100. Ans. The analog output for 6-bit R-2R DAC ladder network

Explain the differences between macros and subroutines, Explain the differe...

Explain the differences between macros and subroutines. Macros Vs Subroutines (i) Macros are pre-processor directives which are processed before the source program is pass

Using information in information system, Using Information in Information S...

Using Information in Information System Information Systems can be thought of as being useful at three levels:  The detail level where information is used to carry out disc

Pre order given find post order ?, The preorder traversal sequence of a bin...

The preorder traversal sequence of a binary search tree is 30, 20, 10, 15, 25, 23, 39, 35, 42. Which one of the following is the postorder traversal sequence of the same tree?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd