General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Design gas compressors, Q. Design Gas Compressors? As gas compressors a...

Q. Design Gas Compressors? As gas compressors are often high investment equipment, it makes sense to locate these well away from other equipment to minimize potential fire dama

Copper alloys, Copper Alloys Some alloys of copper are employed in ind...

Copper Alloys Some alloys of copper are employed in industry for varying causes. Copper forms alloys along with zinc or the brasses, tin or the bronzes, along with tin and pho

Steam turbines, The steam that leaves the super-heater is expanded from 130...

The steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is reheated to 535

Local operator panel for steam generator, Q. Local operator panel for steam...

Q. Local operator panel for steam generator? A local operator's panel is required for operator use during Steam Generator light off. This panel shall contain the following equ

Explain about ducts and flues in steam generators, Q. Explain about Ducts a...

Q. Explain about Ducts and Flues in steam generators? All air ducts and gas flues connecting the forced draft fan, fan intake silencer, preheater, and transition piece at the g

Mircometer, How is a micrometer used?

How is a micrometer used?

Iges application protocol, IGES application protocol: In the year 1977...

IGES application protocol: In the year 1977, the three authors of The Initial Graphics Exchange Specification were identified collectively for their contributions to the growt

Firing rate demand for steam generator, Q. Firing Rate Demand for Steam Gen...

Q. Firing Rate Demand for Steam Generator? The firing rate for each Steam Generator is proportional to the feedwater flowing into that Steam Generator. Thus, the sum of the pa

Determine a real root of the equation, Determine a real root of the equatio...

Determine a real root of the equation xlog10 x = 1.2 by regula-falsi method correct to four decimal places.

Write down the maintenance schedule spark plug replacement, Write down the ...

Write down the maintenance schedule for the following : (a) Spark plug replacement. (b) Engine oil change/ top up period. (c) Steering head bearing.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd