General phase of value engineering, Mechanical Engineering

Assignment Help:

General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Asset utilization, Asset Utilization: The data listed in Tables 1 and ...

Asset Utilization: The data listed in Tables 1 and 2 provide information about M/S Forge Private Limited. Table: Annual Balance Sheet with Partial Information

Find out the motion of the system, Find out the motion of the system: ...

Find out the motion of the system: Block (A) of mass M A = 40 kg is resting on coarse table having coefficient of friction = 0.1. This is tied up with an inextensible rope (

Determine the net work - mechanics, Determine the net work: Q: 5 m ...

Determine the net work: Q: 5 m 3   o f air at 2 bar, 27°C is compressed to 6 bar pressure following PV 1.3   =C . It is expanded subsequently adiabatically to 2 bar. C

Strength of materials., what is the difference betwen proof stress and rupt...

what is the difference betwen proof stress and rupture stress?

Nominal stress and true stress, Nominal Stress and True Stress: Nomina...

Nominal Stress and True Stress: Nominal stress is the ratio of force per initial cross sectional area (original area of cross section). Nominal stress = Force / initial ar

Reactions at point while the system is rotating, Reactions at point while t...

Reactions at point while the system is rotating: 8 kg ball is mounted on a horizontal bar associated to a vertical shaft. Neglecting the mass of the bar and shaft what are the

Cermets-alloys for cutting tools, Cermets Such are the variation of ce...

Cermets Such are the variation of cemented carbides while the carbides of W and Ti are solidified in the softer matrix of Co and Nickel to get high hardness, resistance to hig

Determine the processing time of iges, Determine the Processing Time of IGE...

Determine the Processing Time of IGES File Size/Processing Time: IGES was heavily criticized for requiring large files that took hours or even days to parse, given the averag

Aggregate production planning, Aggregate Production Planning: This uni...

Aggregate Production Planning: This unit provides the definition and physical significance of aggregate production planning. Further, this is illustrated that how the internal

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd