General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Elongation due to self weight, Elongation due to self weight of uniform tap...

Elongation due to self weight of uniform tapered cone bar

Theoretical results-conventional priority rules, Theoretical Results I...

Theoretical Results In the particular machine case, several theoretical results are identified or can be derived: (a) If each operation can be scheduled such that everyone

Dislocation, Diff. B/w edge and screw dislocation

Diff. B/w edge and screw dislocation

Hot and cold working, What is the difference between hot and cold working

What is the difference between hot and cold working

Find the tension in each wire, A 54 kg chandelier is suspended 1.5 m below ...

A 54 kg chandelier is suspended 1.5 m below a ceiling by 3 wires, each of which has the similar tension and the similar length of 2.0 m (see the drawing). Find the tension in every

Boilers, corrosion in boilers is prevented or minimized by maintaining of...

corrosion in boilers is prevented or minimized by maintaining of boiler water

What is wire-frame, What is Wire-frame Wire-frame models use the simpl...

What is Wire-frame Wire-frame models use the simplest data structures and they are ambiguous. Wire frame is a well-known example that consists of 16 vertices and 32 edges. We

Body projected vertically, Qusetion: A body when projected vertically up c...

Qusetion: A body when projected vertically up covers a total distance s, during its time of flight. If we neglect gravity then how much distance, the particle will travel during

Evaluate the gyroscopic couple, The turbine rotor of a ship having a mass o...

The turbine rotor of a ship having a mass of 200Kg moves at 200 r.p.m and its radius of gyration is 0.30 m. If the rotation of the rotor is clockwise looking from the aft., evaluat

Axis perpendicular to the vertical plane - square prism, Axis Perpendicular...

Axis Perpendicular to the Vertical Plane - square prism: Here a square prism, side of base 40 millimeter and axis 60 millimeter long is resting on the HP on its base along wit

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd