General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Functions of flux coating, FUNCTIONS OF FLUX COATING The coating of the e...

FUNCTIONS OF FLUX COATING The coating of the electrode performs very important functions which are essential for obtaining a weld of required quality; in terms of chemical compos

Parallelogram law of forces - mechanics, Parallelogram law of forces: ...

Parallelogram law of forces: The law of parallelogram is used to determine the resultant of two forces acting at the point of a rigid body in plane and is inclined to each o

Turnouts, Turnouts: A turnout is an assembly of various components wh...

Turnouts: A turnout is an assembly of various components whereby a train running on one track may be diverted to another. A sketch of a left-hand turnout is given in Figur

Explain the working of radial drilling machine, Normal 0 false ...

Normal 0 false false false EN-IN X-NONE X-NONE MicrosoftInternetExplorer4

What is the velocity of the crosshead - crank, What is the velocity of the ...

What is the velocity of the crosshead - crank: In the slider crank mechanism shown in Figure, the crank is rotating clockwise at 120 revolution/minute. What is the velocity of

Design bulk materials storage, Q. Design Bulk Materials Storage? Consid...

Q. Design Bulk Materials Storage? Consideration shall be given to providing access to safety showers in areas of hazardous bulk material handling and storage. Where bulk handli

Newer approaches to on-line scheduling, Newer Approaches To On-Line Schedul...

Newer Approaches To On-Line Scheduling  The on-line scheduling has established to be superior option than off-line scheduling upon the shop floor. The on-line scheduling looks

Determine the location of the hydraulic jump, A rectangular channel of widt...

A rectangular channel of width 12ft has an upstream slope of 0.02ft/ft and a downstream slope of 0.0005 ft/ft. Both reaches have lengths of 500 ft. The upstream reach has a Manning

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd