General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

How long does it take a plane, How long does it take a plane, traveling at ...

How long does it take a plane, traveling at a constant speed of 190 m/s, to fly once around a circle whose radius is 2950 m?

What is ifd in project management, Q. What is IFD in project management? ...

Q. What is IFD in project management? The P&IDs now reflect the next intermediate stage of development and incorporate any changes requested by the Customer during the IFA revi

Compound springs how do they work?, Ask Compound springs how do they workqu...

Ask Compound springs how do they workquestion #Minimum 100 words accepted#

Calculate flange stresses, Q. Calculate flange stresses? Step 1: Calc...

Q. Calculate flange stresses? Step 1: Calculate flange stresses for system design conditions using existing gasket dimensions. The minimum width of the gasket should equal or

About cold extrusion punches, is there any other punch material for making ...

is there any other punch material for making cold forged nut except AISI M2

Expression for the maximum shearing stress, Expression for the maximum shea...

Expression for the maximum shearing stress: Obtain expression for the maximum shearing stress and maximum shearing planes. Sol.: The condition for maximum shearing stress i

Velocity acceleration, velocity acceleration by relative method and intenta...

velocity acceleration by relative method and intentan methodto be showed graphical on it?

Calculate stress in the bolts, A new high temperature alloy has been dev...

A new high temperature alloy has been developed with creep properties as follows: stress exponent, m = 4.5, activation energy, Q = 110,000 J/mol and pre-exponential constant,

Incompletely constrained motion-kinematic chain, Incompletely Constrained M...

Incompletely Constrained Motion: While a connection among the elements, building a pair is such that the constrained motion is not done by itself, but by some other means. Such a

Refrigeration, In a steam jet refrigeration system, the ejector extracts 3....

In a steam jet refrigeration system, the ejector extracts 3.3 m3/s of saturated water vapor at a temperature of 7.2 °C from the flash chamber. The return water from the cooling coi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd