General phase of value engineering, Mechanical Engineering

Assignment Help:

General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Tolerance analysis, Tolerance Analysis This discusses the importance o...

Tolerance Analysis This discusses the importance of assigning tolerances to the dimensions. Tolerance analysis is the process of assigning suitable tolerances. Proper assignme

Explain end relief angle, Explain End Relief Angle It is the angle betw...

Explain End Relief Angle It is the angle between the plane perpendicular to base and end flank. The angle prevent\s the cutting tool from rubbing against the job where as if th

Define supports pins and jack pins - locating devices, Define Supports Pins...

Define Supports Pins and Jack Pins When the work is clamped directly in the body of the jig or fixtures, there is always a chance of error due to improper supports on accounts

Ratio of belt tension, Prove that the ratio of belt tension is given by the...

Prove that the ratio of belt tension is given by the T 1 / T 2   = e μθ Let  T1 = Tension in belt on the tight side T2 = Tension in belt on the slack side θ = Angle

Cyclone dip tube length calculation., how can we calcute the length of dip ...

how can we calcute the length of dip tube and what are its effects on cyclone efficiency if we change its length

Electrical science, explain ways of representing alternative quantities;1)p...

explain ways of representing alternative quantities;1)phasor representation 2)graphical representation 3)complex waves 4)addition and subtraction of sine wave

Components of steam power plant, Component s of Steam Power Plant: Th...

Component s of Steam Power Plant: There are four components of steam power plant: 1. The boiler: Hot-source reservoir in which the combustion gases raise steam. 2. Engi

Define the project scope, Q. Define the project scope? The Design Basis...

Q. Define the project scope? The Design Basis Memorandum defines the project scope. This includes basic design concepts and the basis and philosophies upon which the project s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd