General phase of value engineering, Mechanical Engineering

Assignment Help:

General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Determine maximum stress and modulus of elasticity, Determine maximum stres...

Determine maximum stress and modulus of elasticity:  A composite of glass fibres and epoxy has all of fibres laid along the length and is needed to carry a stress of 12 MPa. T

Key words related to railways, Keywords: Degree of Curve      :      ...

Keywords: Degree of Curve      :            The angle subtended at the centre by a chord of 100 ft (30.5 m) length. Super-elevation (cant)        :            The raising

Soldering, Soldering This is a group of join process, which generates, co...

Soldering This is a group of join process, which generates, coalescence of materials by heating them to a suitable temperature and by using a filler metal having a melting point

Waste water treatment, Q. Waste Water Treatment? Typically, there are a...

Q. Waste Water Treatment? Typically, there are a number of waste water streams which need to be treated before disposal to land or water. Depending on the nature of contaminati

Radiation in welding, what is the health effects of ultraviolet ray on the ...

what is the health effects of ultraviolet ray on the eyes of welders

Casting, causes and remedy of coldshut,misruns,shirnkage cavity,microporosi...

causes and remedy of coldshut,misruns,shirnkage cavity,microporosity,metal penetration,mismatch

Initial tension in the belt, Initial tension in the belt: Sol: The t...

Initial tension in the belt: Sol: The tension in belt which is passing over the two pulleys (that is driver and follower) when the pulleys are stationary is an initial tensi

Working of lacashire boiler, Working of lacashire boiler: WORKIN G: ...

Working of lacashire boiler: WORKIN G: Water is filled through feed check valve. On burning fuel over grate, the hot gasses are produced which move in flue gas tubes.

Cost, why are future costs not always relevant?

why are future costs not always relevant?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd