General phase of value engineering, Mechanical Engineering

Assignment Help:

General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Compound springs how do they work?, Ask Compound springs how do they workqu...

Ask Compound springs how do they workquestion #Minimum 100 words accepted#

Strain, is strain in bending important parameter to consider?

is strain in bending important parameter to consider?

Screw jack and friction, Give the equivalence of screw jack and friction on...

Give the equivalence of screw jack and friction on an inclined plane

Industrial jobs, i wanna know is production job is best or marketing after ...

i wanna know is production job is best or marketing after doing btech

Calculate the thickness of insulation, A hot gas at 300°C flows through a l...

A hot gas at 300°C flows through a long metal pipe 100mm outer diameter and 3mm thick. From the standpoint of safety and energy conservation, mineral wool insulation of thermal con

Design a pipeline and pump station to pump water, Design Problem:  Design a...

Design Problem:  Design a pipeline and pump station to pump 100 MGD of water to the Mississippi river.  To reduce the required horsepower of the pumps, the flow will be pressurized

Prototype sand blast method, During the test run of prototype machine we fo...

During the test run of prototype machine we found out a few issue occurred due to blasting room design problem. The blasting room design is too quartet, this design had cause the b

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd