General phase of value engineering, Mechanical Engineering

Assignment Help:

General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Causeways, Paved Dips: Paved dips, also known as bed level causeways,...

Paved Dips: Paved dips, also known as bed level causeways, are structures consisting of gentle and shallow depressions in the road where the water is allowed to flow over the

Centre of gravity and centroid, Q.   Explain the terms centre of gravity an...

Q.   Explain the terms centre of gravity and centroid. Sol. : A point can be found out in a body through which resultant of all such parallel forces acts. This point through

Kinetic or dynamic friction, Kineti c (Dynamic) Friction: When appli...

Kineti c (Dynamic) Friction: When applied force exceeds limiting friction the body starts moving over the other body and the friction of resistance experienced by the body a

Preliminary stress analysis, Preliminary stress analysis work will start ea...

Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed

Calculate the magnitudes of the force, The end gates of a lock are 5m high ...

The end gates of a lock are 5m high and when closed include an angle of 120 o . The width of the lock is 6.25 m. Each gate is carried on two hinged placed at the top and the bottom

Metals and Melting practices - alloy, Metals and Melting Practices - Alloy,...

Metals and Melting Practices - Alloy,Blowing,Carbon Monoxide Normal 0 false false false EN-IN X-NONE X-NONE Microsoft

Steam generator piping, Q. Steam Generator Piping? Control valves shall...

Q. Steam Generator Piping? Control valves shall be Fisher or Purchaser-approved equal. All valves shall be detailed by size, rating, make, model number, and materials Two

Open coiled helical spring, Open coiled helical spring: In an open coi...

Open coiled helical spring: In an open coiled helical spring along with α = 38 o , if the inclination of the coil is ignored, determine the percentage by which the axial exten

Show the vessel internals, Q. Show the vessel internals? Functional des...

Q. Show the vessel internals? Functional design of trays and other removable internals are outside the scope of this document. Removable internals shall be sized to pass thr

What is a pneumatic system?, Pneumatic system is a system that uses air to ...

Pneumatic system is a system that uses air to power something. For example, have you seen the tube systems at bank drive-up tellers? Air is used to drive the tubes back and forth f

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd