General phase of value engineering, Mechanical Engineering

Assignment Help:

General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Submerged arc welding - set up, SUBMERGED ARC WELDING-Set Up Submerged ar...

SUBMERGED ARC WELDING-Set Up Submerged arc welding system consists of the following basic modules: 1. Welding head 2. Power source 3. Flux feeding and recovery units Schematic

Two wheeler, how to adjust the motorcycle clutch play

how to adjust the motorcycle clutch play

Velocity acceleration, velocity acceleration by relative method and intenta...

velocity acceleration by relative method and intentan methodto be showed graphical on it?

Expression for moment of inertia, Drive a mathematical expression for momen...

Drive a mathematical expression for moment of Inertia of a rectangular section. A body consists of a solid hemisphere of radius 4 cm and a right circular cone of height 12 cm. t

Hydrostatic pressure, can a swimming pool that is full be cracked or lifted...

can a swimming pool that is full be cracked or lifted by hydrostatic pressure?

Fermenter dimensions and mechanical design, Once the total volume of an ind...

Once the total volume of an individual vessel has been established the detailed dimensions or mechanical design can be performed. Much of this is based on "Rules of Thumb"  built f

Forging, open die closed die

open die closed die

Flange assembly with bolt elongation measurement, Q. Flange Assembly with B...

Q. Flange Assembly with Bolt Elongation Measurement? Bolt elongation measurement may be used, with COLT engineering approval, at flanges where Hydraulic Bolt Tensioners are imp

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd