Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Calculate tensions in chain and chord - mechanics, Calculate tensions in ch...

Calculate tensions in chain and chord - Mechanics: A lamp of mass 1Kg is hung from the ceiling by a chain and is pulled aside by horizontal chord until the chain makes an ang

What could be the characteristics of tool materials, (a) What could be the ...

(a) What could be the characteristics of tool materials. (b) Describe several tool materials with their composition.

Explain carnot cycle, Explain modified Rankine cycle in detail with T-S and...

Explain modified Rankine cycle in detail with T-S and p-v diagrams. Explain Carnot cycle in detail with P-V and T-S diagram, and also write down expression for work ratio, therm

Explain the process for solve screw conveyer problem, Process for solve scr...

Process for solve screw conveyer problem For fully automatic extension of screw conveyer according to screed width we have to go for some design changes, At the end of main

By ansys finite element discuss the states of stress, A loaded structural c...

A loaded structural component, shown in Fig Q7, is manufactured from sheet steel having a Young's modulus, E = 208000 MPa and a Poisson's ratio, n = 0.3. The sheet steel is 2 mm th

ESSENTIALS OF PROJECT MANAGEMENT, Ask qu1. A small maintenance project cons...

Ask qu1. A small maintenance project consists of the following 10 jobs, whose precedence relationships are identified by their node numbers: JOB NODE NUMBERS ESTIMATED DURATION (DA

Mechanicalthermodynamics, Does this college offer courses in the field of m...

Does this college offer courses in the field of mechanicalthermodynamics?

Measurement of hardenability, Measurement of Hardenability: Two testi...

Measurement of Hardenability: Two testing techniques have been enhancement to measure the harden-ability of steels. The first, termed as cylinder series test, offers a single

Determine forces in members of cantilever truss, Determine  forces in memb...

Determine  forces in members of cantilever truss: Determine  forces  in  members   B C   and  BD   of   cantilever truss  shown  in  the figure in the figure given below.

Carbon and low alloy steels for welding, Q. Carbon and Low Alloy Steels for...

Q. Carbon and Low Alloy Steels for Welding? All welding of pressure retaining equipment must be completed as per the respective code, typically ANSI/ASME B31.1 or Section VIII

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd