General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Gasket installation in module site installation, Q. Gasket Installation in ...

Q. Gasket Installation in Module site installation? Gasket will be installed after modules are set. Normally RTJ flanges require mating flanges to be spread with jacks and then

Determine components of the force vector, Problem - Newton's Second Law in...

Problem - Newton's Second Law in 2D A tow truck tows a 1000-kg car by applying a force of 1000 N north-northeast (67.5° above the x-axis).  a)  What are the components of th

Vibration, what is vibration in terms of mechanical term

what is vibration in terms of mechanical term

Ratio of belt tension, Prove that the ratio of belt tension is given by the...

Prove that the ratio of belt tension is given by the T 1 / T 2   = e μθ Let  T1 = Tension in belt on the tight side T2 = Tension in belt on the slack side θ = Angle

Derivation, how to find the equation for deflection of a cantilever beam su...

how to find the equation for deflection of a cantilever beam subjected to udl in terms of Airy''''s stress function

Governor, what is the formula of sensitivity of governor?

what is the formula of sensitivity of governor?

Why we need paving in design of a plant, Q. Why we need paving in design of...

Q. Why we need paving in design of a plant? Concrete paving should be provided under any equipment where flammable or hazardous liquids may be spilled during routine operation

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd