General phase of value engineering, Mechanical Engineering

Assignment Help:

General Phase of Value Engineering:

Steps-

1. Prepare a strong foundation for the value study.

Extension of auger in screw conveyer in hydraulic paver machine is to be done by manually. 

Due to this we are facing so many problems which are as follows:

01) For the extension of the auger in screw conveyer we have to stop whole machine operation.

02)  We have to carry extra auger shaft with it at site location.

03)  For extension tools are required.

04)  Time is going to be wasted.

05)  Extra labour work is required.

06) Extra linkage arrangement  and disc plate with L support are required

07) Extra lubrication and maintenance are required for smooth operation.       

 


Related Discussions:- General phase of value engineering

Physical properties of materials, why is physical properties of materials i...

why is physical properties of materials important in design and for industrial application?

Compute the diameter of a solid shaft, Compute the diameter of a solid shaf...

Compute the diameter of a solid shaft: Compute the diameter of a solid shaft transmitting 150 kW at 25 rpm, if the maximum shear stress in the shaft is not to exceed 70 MPa. C

Calculate stress intensity factor, Calculate stress intensity factor: ...

Calculate stress intensity factor: For the plate in Figure (a) W = 25 mm, 2a = 10 mm, plate thickness, t = 2 mm, Load P = 1000 N. Calculate stress intensity factor if length o

Test the strength of binders, Strength tests : These tests are carried out ...

Strength tests : These tests are carried out to check the holding powers of various binders used in green moulding sand, dry moulding sand and core sand. These tests are performed

Up milling and down milling, table representing the differences between up ...

table representing the differences between up milling and down milling

If no leak found in the above listed area remove flywheel, If no leak found...

If no leak found in the above listed area remove flywheel: Remove fly wheel and check weather oil leak is from the seal or "o" ring.

Improvements required - industrial safety, Improvements Required - Industri...

Improvements Required - Industrial Safety The outlining of association of safety engineering, as done above, with quality, productivity, profit etc. has also tended to make im

Need for electron beam welding(ebw) process, NEED FOR ELECTRON BEAM WELDING...

NEED FOR ELECTRON BEAM WELDING(EBW) PROCESS   The major advantage resulting from the use of a vacuum environment with a working pressure of from 10 -5 to 10 -3 mbar is esp

Communication protocols applicable in holonic manufacturing , Communication...

Communication Protocols Applicable in Holonic Manufacturing System Communication amongst agents plays an essential role in the Holonic manufacturing system. Exchange of informa

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd