Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Question
Explain some reasons why should acetylene gas cylinders used for gas welding be erected in upright position?
Answer
Acetylene gas is usually used for gas welding as of its ease of production and transportation and its capacity to achieve high temperature in combustion as in around 5,000oF. Acetylene is very much unstable and flammable and would explode in elevated pressure as reacting with oxygen in air. Storing acetylene gas in cylinders in pressure is very risky. thus, for welding purpose, gas acetylene is stored in cylinders of liquid acetone restricted in porous material to enhance there is no free break left for acetylene gas and for cooling principle in event of thermal breakdown.
It also avoids formation of high pressure air pockets inside cylinder. Closed acetylene in acetone will no longer in call with oxygen and is not topic to decomposition. On other hand, acetone is used since it is capable of dissolving large quantity of acetylene gas under pressure without changing nature of gas.
Q. Optimum binder content in bituminous pavement? Amount of binder to be added to a bituminous mixture can't be too excessive or too little. Principle of designing the optimum
If there is steady flow, nothing changes with time. 1. The properties of the fluid at entry and exit are constant. 2. The properties of the fluid at any point in the contro
Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped
im looking for someone to do drawing in autocad 3D 2013 with report
how to solve the problems of cross sectional surveying and profil questions
Workshop Drawings (Contractor Scope) 1. Air Conditioning and Ventilation Systems: Builder work drawings Enlarged scale double line HVAC System Duct & piping layouts
what are the characteristics of the beam to column connection?
Depth of Boring for Multi-storeyed Building Peck has recommended that first drill hole is to be made up to depth at which the presence of a thick layer of soft clay with a hig
Question Explain the reason why is sulphate-resisting cement not used in marine concrete ? Answer Major components of Portland cement are tricalcium silicate, dicalciu
what is risk assesment
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd