Functions of water stops in joints of box culverts, Civil Engineering

Assignment Help:

Question
What will functions of water stops in joints of box culverts and drainage channels?

Answer
Principal function of water stops is to stop liquids, water-borne materials and solids to go through concrete joints. In essence, it plans at provided that water tightness to drainage channel.

Moreover, water stops in drainage channels or box culverts are able to also serve two reasons-
(i) To evade water contacting joints dowel bars and causing corrosion.
(ii) To evade water seeping in from underside of drainage channels or box culverts, thus washing in dirt particles and causing void under these structures and at last leading to their failure. To serve second purpose, clearly only one water stop is necessary at depth location.

To serve up first purpose, water stop has to be installed on pinnacle of dowel bars to stop water from drainage channels from leaking from side to side. On other hand, water stop has to be offered under dowel bars to keep away from secretive water from surging upwards.

In fact, other way out to serve first purpose is by using corrosion anti bars.

 


Related Discussions:- Functions of water stops in joints of box culverts

Local vehicle parapet strong enough to contain vehicles, Q. Local vehicle p...

Q. Local vehicle parapet strong enough to contain vehicles? Majority of local parapets are 1.1m high in addition they are designed to resist impact from a 1.5ton car moving at

Explain the term - loss of prestress, Explain the term - Loss of Prestress ...

Explain the term - Loss of Prestress At the transfer stage, tendons produce compressive stresses in concrete. Sooner or later, the magnitude of  these stresses experiences a re

Calculate the specific gravity of the soil particles, A piece of clay taken...

A piece of clay taken from a sampling tube has a wet weight of 1.553 N and volume of 95.3 cm 3 . After drying in an oven for 24 hours at 105°C, its weight 1.087 N. Suppose the spec

Compatibility condition, Compatibility Condition: Total strain in ste...

Compatibility Condition: Total strain in steel = Total strain in copper i.e. 3 × 10 -4 + 1.965 × 10 -5 P s   = 4.5 × 10 -4 + 1.8421 × 10 -5 P c Recognising that P

cement, what is the manufacturing process of regular portland cemen

what is the manufacturing process of regular portland cement

Energy absorbed in heeling during vessel berthing, Q. Energy absorbed in he...

Q. Energy absorbed in heeling during vessel berthing? When a vessel   berths on a fender system at a pier, point of contact of berthing ship can be below or above the centre of

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd