Q. Function of waterproof (or separation) membrane for concrete carriageway
A layer of waterproof (or separation) membrane is usually placed between sub-base and concrete slab for the below reasons:
(i) It prevents loss of water from cement paste that affects the strength of concrete slab.
(ii) It improves the movement of concrete slab relative to sub-base layer and decrease the frictional forces developed at their interface.
(iii)It avoids the possibility of active aggressive agents from soil water being attached to concrete slab.
(iv) It prevents intermixing of freshly placed concrete with loose materials on the surface of sub-base.
Fig: Location of separation membrane in concrete carriageway
Q. Explain Condition Rating Number? 1. A Condition which warrants rebuilding / re-habilitation immediately. 2. A Condition which requires rebuilding / re-habilitation on pro
Q. What do you understand by Percolation of water? Percolation of water into the ground or embankment takes place, causing rise in water table and / or saturation of the body.
centroid of shaded area
Explain the Properties of Poly Tetra Fluoro Ethylene? PTFE is a linear chain polymer of great molecular strength, known for its chemical inertness and low coefficient of fricti
what are the necessary data required for foundation recommendation other than SPT value ? why can''t we go for SPT value alone?
define principles of survey
Modern marketing calls for more than just developing a good product, pricing it attractively, and making it available to target customers. Companies must also communicate with thei
Explain the Bridge Selection Criteria - Underwater inspection? Various factors influence the bridge selection criteria. As a minimum, all structures must receive routine underw
Q. What do you mean by Laying of apron in design of bridge? Width of apron laid on river bed should be 1.5 D1 where D 1 is estimated scour depth in metres below river bed. Thi
Q. Sand layer vs. cement sand used as bedding of precast concrete paving units Cement sand is a mixture of sand and cement and it behaves as a cohesive mass once mixed. Usuall
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd