Q. Function of waterproof (or separation) membrane for concrete carriageway
A layer of waterproof (or separation) membrane is usually placed between sub-base and concrete slab for the below reasons:
(i) It prevents loss of water from cement paste that affects the strength of concrete slab.
(ii) It improves the movement of concrete slab relative to sub-base layer and decrease the frictional forces developed at their interface.
(iii)It avoids the possibility of active aggressive agents from soil water being attached to concrete slab.
(iv) It prevents intermixing of freshly placed concrete with loose materials on the surface of sub-base.
Fig: Location of separation membrane in concrete carriageway
does felid scope in civil eng. if we start consiltancy job
The tensile strength of a material is the value at which the material fails when subjected to a tensile force. (Tensile means a force pulling the wood fibers lengthwise, as opposed
If the diameter of the base remains constant, by what factor should the altitude be multiplied to produce a cone with twice volume as the original
what is stepped aeration
Question What are key reasons for conducting pull-out tests for soil nails ? Answer There are largely four bases for this examination- (i) To verify and verify bo
what is the meaning of offset
Explain National Priorities List (NPL) - Also known as superfund list - Identify sites which appear to present a significant risk to public health or the environment (Throug
collect the field deta manualy and drw the drawing as per scale
Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki
Explain brief about the term - Anchorage A device used to anchor tendons at the end of a concrete member is called as an anchorage in the case of post-tensioned concrete. In th
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd