Q. Function of waterproof (or separation) membrane for concrete carriageway

A layer of waterproof (or separation) membrane is usually placed between sub-base and concrete slab for the below reasons:

(i)  It prevents loss of water from cement paste that affects the strength of concrete slab.

(ii) It improves the movement of concrete slab relative to sub-base layer and decrease the frictional forces developed at their interface.

(iii)It avoids the possibility of active aggressive agents from soil water being attached to concrete slab.

(iv) It prevents intermixing of freshly placed concrete with loose materials on the surface of sub-base.

347_Function of waterproof membrane for concrete carriageway.png

Fig: Location of separation membrane in concrete carriageway


Related Discussions:- Function of waterproof membrane for concrete carriageway

Position of shear keys under retaining walls, Installation of shears keys a...

Installation of shears keys assists to increase sliding resistance of retaining walls without the necessity to widen the base. Effect of shears keys enhances the deepening of the s

Void ratio, why void ratio is greater for fine gained soil then course grai...

why void ratio is greater for fine gained soil then course grained soil.

How quality control is maintained in a rolled fill dam, Sketch a curve show...

Sketch a curve showing the relation among dry density and moisture content for Standard Proctor test and indicate the salient features of the curve. Describe why soils are compacte

Ghgh, Ask quhestion #Minimum 100 words accepted#

Ask quhestion #Minimum 100 words accepted#

Explain interim inspection - underwater inspection of bridge, Explain the I...

Explain the Interim inspection - underwater inspection of bridge An interim inspection is an inspection scheduled at the discretion of the engineer. An interim inspection is us

Explain inspection tools for underwater inspection of bridge, Explain the I...

Explain the Inspection Tools for Underwater Inspection of Bridge? So many Inspection tools are available. The dive team should have access to the suitable tools and equipments

Surveying, if bearing of AB is 190& that of CB is 260,the included angle AB...

if bearing of AB is 190& that of CB is 260,the included angle ABC is how?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd