Question
What is function of longitudinal joints in concrete road pavements?
Answer A longitudinal joint consists of a tie bar located at mid-depth of a concrete pavement and it is not intended for joint lateral movement. Then one might doubt the reasons of placing longitudinal joints in concrete pavements. In fact, longitudinal joints are usually designed at a regular spacing as in 4.5meter to accommodate effect of differential settlement of pavement foundation. At what time uneven settlement occurs, tie bars in longitudinal joints perform as hinges that allow for settlement of concrete carriageway. Furthermore, it also serves to cater for effect of warping of concrete due to moisture and temperature gradients by permission of a small quantity of angular movement to occur consequently that stresses induced by restrained warping can be avoided. Dowel the bars are provided in longitudinal joints for following causes-
(i) In case of occurrence of uneven settlement between adjacent panels, it assists to preserve a level surface by transfer of loads through dowel bars.
(ii) Keep longitudinal joints close.
Concept of load balancing In above cases of concentric and eccentric pre-stressing, straight tendon profiles (or tendon shapes) along the beam span have been considered. If a t
Lubrication of rail joints is one of the important items of permanent way works incidental to systematic track maintenance, the lubrication of joints is done for the following purp
mechanical monometer
Types of bricks
How to do assignment on the basis of azetropic mixture
Use of Admixtures in Concrete The use of chemical admixtures may be made in prestressed concrete construction. But the admixture should not contain chlorides in any form. This
Derived condition of economic span of bridge
On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g
Q. The field density of a compacted fill is determined by means of a core cutter whose empty weight is 1000 g and volume is 1000 cm 3 . The cutter full of soil weights 2890 g. If
WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD IN LEVELLING?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd