Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Framework for Indicators in Electricity Sector
A framework has been developed and a set of core indicators for electricity Sector has been proposed. In the first example, mapping the main sources of data could follow the proposed framework and indicators as some of these will be readily available from open sources. Therefore, the data requires to be regularly updated and there does not seem to have a sustained effort at the level of the organization to do this.
The suggested KPIs could be adopted at National level along with a varying degree of benchmark. An atmosphere of accountability, measurement and improvement thus can be created that will provide benefit to electricity Distribution Sector with more satisfied customer. The Ministry of Power requires to give a requisite impetus to all the participating utilities to work upon to first monitor the KPIs, compare them internally and along with other utilities and to create an atmosphere of excellence along with a reward and penalty provision.
Economic regulation of utilities/ DISCOMs generally focuses on price regulation, with associative less attention to performance standards and social obligations. Instead, technical rules are not commonly concerned along with economic aspect and cost-efficiency. The linkage of economic and technical regulation after liberalisation presents a challenge for regulators. The existing norms are unsatisfactory; thus, it is quite necessary to move quickly towards international standards in stages.
Roadmaps for every stage are to be decided through regulators.
What is meant by Daisy Chaining method? It does not need any priority resolving network, rather the priorities of all the devices are effectively assumed to be in sequence.
What is an interrupt? An interrupt is either a software-generated CALL or hardware-generated CALL.
Compare Procedure & Macro Accessed by CALL & RET instruction Accessed during assembly with name given during program implementation to macro when defined Machine code for inst
Q. Input offset current of operational amplifier? The adverse effect of the input bias current mentioned would be nulli?ed if both inputs were connected to equal resistances (o
Q. The N-coil windings of a three-phase, two-pole machine are supplied with currents ia,ib, and ic, which producemmfs given by F a = Ni a cos θm; F b = Ni b cos(θm - 120°); and
Explain immediate data addressing mode (with examples) available in microprocessors. Immediate Mode: The operand given in immediate mode is the actual data itself.
Q. Show how the conservation of power is satisfied by the circuit of Figure.
Complete the financial reporting for each period and develop recommendations using the templates provided. Procedure 1. Read the case study. 2. Complete the financial re
Explain temperature dependence of electrical conductivity and resistivity in conductors. When the temperature is increased, there is a greater thermal motion in atoms that redu
Help me, i need some answer regarding Voltage breakdown. What formula do I use?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd