Large catchments in estimating peak runoff, Civil Engineering

Assignment Help:

Question

Is it true that rational process has to not be used for large catchments in estimating peak runoff?


Answer

Rational process is appropriate for small catchments only as time of absorption of small catchments is small. In Rational system peak runoff is calculated based on assumption that time of concentration is equal to rainfall duration. For small catchments, this assumption might hold true in mainly circumstances. One of assumptions of rational process is that rainfall intensity over entire catchment remains constant all through storm period. Though, in case of a large catchment it stands a high possibility that rainfall intensity varies in a variety of part of large catchment. In adding, for long period of rainfall, it is rare that rainfall intensity remains constant over total rainstorm and a shorter period but an additional intense rainfall might create a higher peak runoff. Furthermore, a decrease of peak runoff is also brought about by temporary storage of storm water similar to channels within catchment.

In genuine condition, runoff rate within catchment differs from place to place since of different soil properties and past conditions. Sometimes peak free occurs before all of drainage area is contributing. For example, when a significant portion of drainage area within catchment has very little time of concentration so that a higher rainfall strength be able to be used for this portion, runoff coming solely from this portion is higher than that of whole catchment in which a lower rainfall strength is adopted since remaining part of catchment has comparatively large occasion of concentration. Therefore, this results in wrong estimation of peak runoff of large catchments if rational process is adopted.

 

 


Related Discussions:- Large catchments in estimating peak runoff

Define abrasion - underwater inspection of bridge, Define Abrasion - underw...

Define Abrasion - underwater inspection of bridge? Deterioration of substructures by abrasion is caused by wave action, the velocity of the currents and the action of suspended

Soil plug in marine piling system of steel tubular pile, Soil plug in marin...

Soil plug in marine piling system of steel tubular pile with reinforced concrete infill At the time of initial driving process, open-ended steel piles are driven through the s

Define limitations of radiography - inspection of bridge, Define Limitation...

Define Limitations of Radiography - Underwater Inspection of Bridge? i. Radiography is a costly and time consuming method, which re- quires extensive safety measures to be adop

Is codes for building materials and construction, IS CODES FOR BUILDING MAT...

IS CODES FOR BUILDING MATERIALS AND CONSTRUCTION The following is the list of some of the IS code giving requirements for building materials: IS 269-1989. Specification for ord

Define the term - permanent load, Define the term - permanent load Wher...

Define the term - permanent load Where the permanent load is less than or equal to 25% of the design imposed load, deflections may be calculated using any elastic method. When

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd