Is it true that rational process has to not be used for large catchments in estimating peak runoff?
Answer
Rational process is appropriate for small catchments only as time of absorption of small catchments is small. In Rational system peak runoff is calculated based on assumption that time of concentration is equal to rainfall duration. For small catchments, this assumption might hold true in mainly circumstances. One of assumptions of rational process is that rainfall intensity over entire catchment remains constant all through storm period. Though, in case of a large catchment it stands a high possibility that rainfall intensity varies in a variety of part of large catchment. In adding, for long period of rainfall, it is rare that rainfall intensity remains constant over total rainstorm and a shorter period but an additional intense rainfall might create a higher peak runoff. Furthermore, a decrease of peak runoff is also brought about by temporary storage of storm water similar to channels within catchment.
In genuine condition, runoff rate within catchment differs from place to place since of different soil properties and past conditions. Sometimes peak free occurs before all of drainage area is contributing. For example, when a significant portion of drainage area within catchment has very little time of concentration so that a higher rainfall strength be able to be used for this portion, runoff coming solely from this portion is higher than that of whole catchment in which a lower rainfall strength is adopted since remaining part of catchment has comparatively large occasion of concentration. Therefore, this results in wrong estimation of peak runoff of large catchments if rational process is adopted.
Compute the stresses at top and bottom fibres in a simply supported pre-stressed concrete beam with a rectangular cross section, 200 mm wide and 400 mm deep at sections A-A, B-B an
Define the meaning of Grout - Concrete Grout should be made with any type of recommended cement and using water of a required quality. If very large size ducts are to be groute
what is sheer stress on triangle beam.
Q. What are basic types of elastomeric bearings? Three basic types of elastomeric bearings are used. 1. Plain elastomeric pads 2. Steel reinforced elastomeric pads 3.
finite elements
Define Diving Operation - Preparation for underwater inspection? Use of experienced divers trained and screened by a reputed commercial diving school is critical for successful
Shear stress distribution in circular section
Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T
Define the usage of Data from Hydrographs Flow rates and volume quantities over time. Predictions based on the runoff flow rates. The characteristics of the drainage b
Question After construction of watermain, earlier to hydrostatic pressure test , swabbing is approved out. What is main purpose of swabbing ? Answer Pipelines ha
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd