Question
Is it true that rational process has to not be used for large catchments in estimating peak runoff?
Answer
Rational process is appropriate for small catchments only as time of absorption of small catchments is small. In Rational system peak runoff is calculated based on assumption that time of concentration is equal to rainfall duration. For small catchments, this assumption might hold true in mainly circumstances. One of assumptions of rational process is that rainfall intensity over entire catchment remains constant all through storm period. Though, in case of a large catchment it stands a high possibility that rainfall intensity varies in a variety of part of large catchment. In adding, for long period of rainfall, it is rare that rainfall intensity remains constant over total rainstorm and a shorter period but an additional intense rainfall might create a higher peak runoff. Furthermore, a decrease of peak runoff is also brought about by temporary storage of storm water similar to channels within catchment.
In genuine condition, runoff rate within catchment differs from place to place since of different soil properties and past conditions. Sometimes peak free occurs before all of drainage area is contributing. For example, when a significant portion of drainage area within catchment has very little time of concentration so that a higher rainfall strength be able to be used for this portion, runoff coming solely from this portion is higher than that of whole catchment in which a lower rainfall strength is adopted since remaining part of catchment has comparatively large occasion of concentration. Therefore, this results in wrong estimation of peak runoff of large catchments if rational process is adopted.
A raft, 9 m × 27 m, is founded at a depth of 3 m in sand with a value of N = 25 up to great depth. Verify the total load which the raft can support. If the raft is designed as
Determine the stresses within the rod: Two parallel walls are stayed together through a steel rod of 5 cm diameter passing through metal plates and nuts at both ends. The nuts
methods of extracting aggregates
Transit Sheds and Warehouses: These are sheds constructed as steel frames or RCC frames with a steel truss, with galvanised iron or asbestos cement sheets. Transit sheds may b
describe in detail the various parts of a total station
In carrying out pull-out tests for soil nails, it generally requires the unloading and loading of soil nails of several cycles up to 80% of ultimate tensile strength of soil nails.
An undisturbed sample of sand has a dry weight of 18.9 N and a volume of 1143 cm 3 . The solids have a specific gravity of 2.72. Laboratory tests indicate void ratios of 0.40 and 0
Explain Rapid Mixing Tank For the chemical reactions to occur, the chemicals must be mixed with water for both coagulation and softening we need mixing of chemical wi
Explain some Important Points for Hazardous Waste The mixture rule prevents dilution of waste for the purposes of escaping RCRA regulation. Mixtures of a listed hazardous w
three points problem
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd