Flow Process Chart
Flow process chart is defined as a graphic representation of all operations inspections transportations delays and storages occurring during a process or procedure which includes information considered necessary for analysis such as time required, quantity and distance moved etc.
Types of Flow Process Charta) Man type it records what the worker does.b) Material type: It records what happens to the material.c) Equipment type: It records how the equipment is used.
Flow process char is an amplified form of operation chart. All the detailed information regarding the process is to be record i, e, all the five symbols are used to write down the details of the activity. It is always recommended that a chart should represent the flow of either man, material or machine at a time. This chart is very important for the analysis purpose. Because it gives a complete picture of what is being ‘done and helps the man to understand the facts and their relationship the facts and their relationship. To one another. All the details which may appear on the chart must be obtained from direct observations. Further wherever the transportation symbol is used the actual distance covered by man material or machine should be recorded. A specimen of flow process chart may be seen in the figure aside.
A company wants to select one product from a set of 3 possible products. Which of the following ensures that only one product will be selected? A XA + XB + XC = 1 B XA + XB
Calculate the minimum replenishment time to build 2500 Model A fountains given the following beginning inventories?
Factors for plant Location choice - Availability of Services There are six main services which need to be considered: Gas Electricity Water Drainag
the desired daily output for an assembly line is 360 units.this assembly line will operate 450 minutes per day
How do you determine as a project manager when project work should be contracted out, and how does risk enter into the decision?
Analyze Procter & Gamble's (Case 8) resources and capabilities as well as its structures and systems. Internal resources and capabilities. How should P&G's strengths be leverage
Hard Factors - Factors Affecting Productivity Improvement Productivity of the product is determined by the way in which the product fulfils its customer requirements, either b
When it is claimed that people that ‘pay' for wrongs are unfairly burdened and should not bear the responsibility for the acts of others, they are opposing to Answer reverse discri
1. What are the steps in the method study procedure? Answer: Select, record, examine, develop, install, maintain.
Q. What are the receipts handling in the purchasing department? Receipts handling: It is the responsibility of the purchasing department: a. Shipping and transport manag
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd