Five forms of waste within manufacturing organisations, Operation Management

Assignment Help:

Describe FIVE forms of waste within manufacturing organisations that lean process improvement aims to eliminate.

  • Inventory (all components, work in progress and ended product not being processed).
  • Motion (people or equipment moving or walking more than is needed to perform the processing).
  • Waiting (waiting for the next production step).
  • Over-production (production ahead of demand).
  • Over-processing (resulting from poor tool or product design making activity).
  • Defects (the effort include in inspecting for and fixing defects).

 


Related Discussions:- Five forms of waste within manufacturing organisations

Explain product-by-value analysis, Prepare a product-by-value analysis for ...

Prepare a product-by-value analysis for the following products, and given the position in its life cycle, identify the issues likely to confront the operations manager, and his or

Routing, Routing Meaning and Definition Routing is the first bu...

Routing Meaning and Definition Routing is the first but the important and difficult task of the production control. Routing means determination of path or route on whic

Explain the categories of problems, Describe the categories of problems tha...

Describe the categories of problems that have been found to be approached by Six Sigma methodology.

Which depreciation method is preferable and why, 1. Your firm is considerin...

1. Your firm is considering an investment in a wind farm. Assume that the farm will cost $1 million per MW of installed capacity. The plan under consideration would deploy 10 GE 1.

Define what are the three steps in completing a job analysis, As an entrepr...

As an entrepreneur, how would you go about doing a job analysis for the first employee you are going to hire in your new business? What are the three steps in completing a job anal

Problem 8, a small assembly line for the assembly of power steering pumps n...

a small assembly line for the assembly of power steering pumps needs to be balanced. exhibit 8.11 is the precedence diagram. the cycle time is determined to be 1.5 minutes. how wou

What is the goal of swot analysis, The goal of SWOT analysis is to ________...

The goal of SWOT analysis is to ________ the organization's opportunities and strengths while ________ its threats and ________ its weaknesses. (a) avoid; neutralizing; correcti

Learning teaching and assessment strateg, Learning Teaching and Assessment ...

Learning Teaching and Assessment Strategy: Key lectures will be delivered and immediately followed up by group tutorials in which the opportunity to critically reflect, analys

Find forecasted sales for week first, In the table given below the Distribu...

In the table given below the Distribution Manager is expected to service these DCs as per the demands placed. If the actual sales after completing week one is as follows, what woul

Operation research, six operators are to be assigned to five jobs with the ...

six operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. determine the optimal assignment. which operator will have no assignment

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd