Fire risk assessment process, Other Engineering

Assignment Help:

Fire risk assessment process:

This is the main part of the FRA process.    Here we consider the risk, measure it against what we consider acceptable and, if we consider that the risk is too great, we make our recommendations for remedial actions that will reduce or eliminate the risk.

Our recommendations may be for preventative measures or may be for fire precautions

- i.e. those measures that will make the building safe even if there is a fire within it.

This element is about recording the findings and recording the remedial actions that are required to make the risk acceptable. It also mentions co-operating with others and training staff.

Finally, the process is not meant to be done once and then forgotten about.  It should be carried out regularly and reviewed every time that there are any changes to the building, the people in it, the contents in it or the processes that take place within it. The period between regular reviews varies according to the type of premises involved. In a low risk office the review might only be required every two or three years but in a high life risk shopping mall the review should be at least once per year.

 

 


Related Discussions:- Fire risk assessment process

Thermodynamics, What are the importance of engineering thermodynamics

What are the importance of engineering thermodynamics

Propeller governing mode, Propeller governing mode: The speed lever is ...

Propeller governing mode: The speed lever is placed in the high position. The engine is operating at 97 percent. As the power lever is advanced ahead of the flight idle deten

.quantifying financial risk, What is the standard deviation of return if we...

What is the standard deviation of return if we have the following two possible outcomes: a rise of 8.00 per cent with 0.58 probability or a fall of -6.00 per cent?

European vanilla Call option with strike price, Let C(K) denote a European ...

Let C(K) denote a European vanilla Call option with strike price K. Assume that all options are identical except for strike price, and strike prices satisfy K1 Question 1: What ar

Project, list 10 major project topic in agricultural engineering

list 10 major project topic in agricultural engineering

Common faults - fire safety management, Common faults - Fire safety managem...

Common faults - Fire safety management: Common faults found are: Combustible items left in protected routes Locked exits Fire doors wedged open Exits obstru

Cupola, The cupola is the most widely used furnace in the foundry for melti...

The cupola is the most widely used furnace in the foundry for melting ferrous and non ferrous metals and alloys. Various zones of cupola     (i)            Well or crucibl

Reed solomon code, i have created simulink model for rs code with overlapp...

i have created simulink model for rs code with overlapped symbol and without overlapped symbol. and BIT ERROR RATE VERSUS EB/NO PLOT is observed for its performance analysis.but i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd