Find the maximum stress, Civil Engineering

Assignment Help:

Find the maximum stress:

A circular bar rigidly fixed at both ends is 1 m long and tapers uniformly from 20 cm diameter at one end to 10 cm diameter at the other end. Find the maximum stress in the bar, if its temperature is raised through 50oC. E = 2 × 105 N/mm2 and α = 12 × 10-6  K-1.

Solution

Here,

d1 = 20 cm = 200 mm

d2 = 10 cm = 100 mm

L = 1 m = 1000 mm

ΔL = 50°C

∴          σmax = Ed1 α ΔT/d2 = 2 ×105×200×12×10-6×50/100

= 240 N/mm2.


Related Discussions:- Find the maximum stress

A concrete compression machine, Question In a concrete compression test , ...

Question In a concrete compression test , usually 150mmx150mmx150mm concrete cube examples are used for testing. Why isn't 100mmx100mmx100mm concrete cube samples used in test in

Concrete technology, why strength of transition zone is less than bulk past...

why strength of transition zone is less than bulk paste

Calculate time taken for consolidation in actual layer, A clay layer 5 m th...

A clay layer 5 m thick has double drainage. It was consolidated under a load of 127.5 kN/m2. The load is enhanced to 197.5 kN/m 2 . The coefficient of volume compressibility is 5.7

Kerb overflow weirs – horizontal bars vs. vertical bars, Q. Kerb overflow w...

Q. Kerb overflow weirs – horizontal bars vs. vertical bars? Overflow weirs must be provided for steep roads (longitudinal gradient>5%), flat roads (longitudinal gradient Ess

Work, Grouted or Penetration Macadam:

Grouted or Penetration Macadam:

Levelling procedure, how to carry on leveling using dumpy level????????????...

how to carry on leveling using dumpy level????????????

Calculate the amount of waste, Calculate the Amount of Waste A municipa...

Calculate the Amount of Waste A municipal solid waste department plans to separate a portion of the ferrous metal, newsprint and cardboard from its MSW waste stream. The depart

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd