False alarms & cm , Other Engineering

Assignment Help:
False Alarms & CM 
  • The mis-association of false alarms with target tracks has two main e!ects. 

- It tends to increase the actual tracking errors in the system because the introduction of measurements from false alarms will have different noise properties to those of the target.
- Secondly, the track could become ‘locked' onto the false alarm rather than the true target. Once several false alarms have been associated with the track, the track states reflect the properties of the false alarm rather than the target, making mis-association more likely.
- This is the basis for many missile countermeasure systems (e.g. ?ares as EO countermeasures).
- Since missiles can be programmed to ignore targets that undergo rapid manouveres (such as being dropped out of a flare/chaff dispenser), flares and radar decoys are now designed to follow the trajectory of the aircraft for a short distance to ‘lure' the missile away from the aircraft.

 


Related Discussions:- False alarms & cm

Logic gate - nand gate, NAND Gate; When constructing a NAND gate using ...

NAND Gate; When constructing a NAND gate using transistors as the switching devices, the output often represents the 'inversion' of the "AND" gate. Figure 4 shows an example o

Bajaj electronics company, how would you judge the potential profits of Baj...

how would you judge the potential profits of Bajaj electronics on the first year of sales to booth plastics and give your views to increase the profit?

Probabilistic analysis - fire risk assessment , Probabilistic analysis - Fi...

Probabilistic analysis - Fire risk assessment: Probabilistic analysis relies on data and data comes from experience.  The broader the experience, the larger the data source an

Heisenberg''s uncertainty principle , According to this it is impossible to...

According to this it is impossible to specify precisely and simultaneously two physical quantities those are canonically conjugate to each other and the product of the uncertainty

Maintenance of aircraft under “b” conditions, Maintenance of Aircraft under...

Maintenance of Aircraft under “B” conditions:   The maintenance of aircraft flying under "B" conditions must be adequate in relation to the number and duration of the flight

Principal of assembly buildings- fire protection engineering, Principal of ...

Principal of Assembly buildings- fire protection engineering: As assembly buildings accommodate members of the public they often accommodate people with disabilities. People

Siliconizing, 1.defination 2.explain the mechanisms of each process. 3. exp...

1.defination 2.explain the mechanisms of each process. 3. explain in detail how many types of each process 4. advantages 5. disadvantages

#title. pid controller matlab coding for second order equat, can i get pr...

can i get prportional and integral controller matlab coding to solve my load flow analysis

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd