False alarms & cm , Other Engineering

Assignment Help:
False Alarms & CM 
  • The mis-association of false alarms with target tracks has two main e!ects. 

- It tends to increase the actual tracking errors in the system because the introduction of measurements from false alarms will have different noise properties to those of the target.
- Secondly, the track could become ‘locked' onto the false alarm rather than the true target. Once several false alarms have been associated with the track, the track states reflect the properties of the false alarm rather than the target, making mis-association more likely.
- This is the basis for many missile countermeasure systems (e.g. ?ares as EO countermeasures).
- Since missiles can be programmed to ignore targets that undergo rapid manouveres (such as being dropped out of a flare/chaff dispenser), flares and radar decoys are now designed to follow the trajectory of the aircraft for a short distance to ‘lure' the missile away from the aircraft.

 


Related Discussions:- False alarms & cm

Measurements of economic worth, Measurements of Economic Worth There a...

Measurements of Economic Worth There are several methods of economic worth used to compare alternatives. If you decide to use present worth analysis, then you have indicate a

Solidification of casting, Q. Describe the terms "Solids zone", "Mushy Zone...

Q. Describe the terms "Solids zone", "Mushy Zone" and "Liquid Zone" used in solidification of casting and explain directional solidification in casting. Ans. Solidificati

Chemical engineering, i got an assignment on chemical engineering reactions...

i got an assignment on chemical engineering reactions

Capital Budgeting Project.., Assignment: You are interested in proposing a ...

Assignment: You are interested in proposing a new venture to the management of your company. Pertinent financial information is given below. BALANCE SHEET Cash 2,000,000 Accounts

Petroleum Engineering project, I need help About the project I sent and it ...

I need help About the project I sent and it is the third time I am sending so please I really want help

Engineering Risk and Reliability , The demand placed on a system is describ...

The demand placed on a system is described by a lognormally distributed random variable with mean 50 and standard deviation of 10. The capacity of the system is modeled by a Weibul

Automatic synchronising - propellers, AUTOMATIC SYNCHRONISING: Automa...

AUTOMATIC SYNCHRONISING: Automatic Synchronisation uses engine driven synchronising alternators to detect electrically any increase or decrease in a slave engine's speed.  Ea

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd