East Coast Manufacturing, Inc. plans to locate a new production facility in Hartford, Philadelphia, or Baltimore. Six location factors are important: cost per product unit, labor availability, union activities, local transportation, proximity to similar industry and proximity to raw materials. The weighting of these factors, the scale for each factor and the scores for each location are shown below. Different SME's (subject matter experts) scored each of the non-economic factors. So, unfortunately, the scores for the non-economic factors are scaled differently. The scales are indicated on the table. On the scale, the highest score is always the best value. For example, for the scale 1-5, the best value is 5. For each of the Non-economic factors, it is possible to score the maximum.
Location Factor
Factor Weight
Scale
Hartford
Philadelphia
Baltimore
Cost per product unit
0.55
$48
$59
$52
Labour availability
0.15
0-5
2.5
4.0
Union activities
0.10
0-3
2.7
1.8
0.9
Local transportation
1.2
2.4
Proximity to similar industry
0.05
0-1
0.5
1.0
0.7
Proximity to raw materials
0.6
0.4
For the following, calculate all results three decimal place (example, 0.xxx or x.xxx).
a) Using the factor scoring (or equivalent the factor rating) approach we studied in class and modified as appropriate, which site do you recommend? Why?
b) With everything else remaining the same as in the problem statement, what must the cost per product unit for Philadelphia be so that its total factor score is equal to the total factor score for Hartford?
1. If the design tolerance limits for the process are 9.7/11.2, determine the process capability indices C p and C pk . Comment on the values obtained. 2. 1000 items produced
Discuss the advantages and disadvantages of each decision that Elaine has made
List one of the seven management tools and discuss how they might be used in developing a new product.
To determine the standard working time for a special job, following observation data is collected: Observation 1 2 3 4 5 6 7 8 Time (in second) 17 18 15 14 13 15 16 13 a) If the pe
Role or Forecasting in capacity Planning The marketing department plays a major role in providing demand forecasts based on which both long term as well as short term capacity p
1. What is a serial entrepreneur? Is this a new phenomenon? 2. What does it take to be a successful serial entrepreneur? 3. Steve Chen, former PayPal engineer who co-founded
Types of Process Designs The basic type of production system and the finished goods inventory policy to be used must be decided at the earliest stages of process planning. The
Matthew Yachts, located in Montauk, Long Island, manufactured sailing yachts of all descriptions. The company had begun by building custom-designed yachts for a largely New York-ba
Organizations periodically turn to _________ to meet demands for talent brought about by business growth and a desire for fresh ideas, or to replace employees who leave.
Hertford Post Office Situation: Hertford has a typical small town post office that sells stamps, rents post office boxes, and delivers mail to postal customers. a. Identify possibl
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd