Explain what''s the difference between these abbreviations, Operation Management

Assignment Help:

In e-mails writers sometimes use abbreviations such as FYI(for your information), ASAP(as soon as possible). Others writers sometimes use LOL (laughing out loud), 4 u(for you), gr9(great). What's the difference between these abbreviations, and how do they contribute to one's professional image?


Related Discussions:- Explain what''s the difference between these abbreviations

Explain e-activity robust, From the e-Activity, discuss ways the company yo...

From the e-Activity, discuss ways the company you researched could benefit (or more likely already is benefitting) from robust materials requirement planning. Provide specific exam

Explain drum-buffer-string, According to Elyahu Goldratt, the TOC system us...

According to Elyahu Goldratt, the TOC system uses a scheduling approach called _____. drum-buffer-rope drum-buffer-string drum-rope-buffer drum-buffer-line

Explain technology-intensive method of production, A production method that...

A production method that relies on large quantities of machines and equipment and smaller quantities of labor is referred to as a 1. variable-input-intensive method of productio

Objectives of work measurement, Objectives of Work Measurement: 1.    ...

Objectives of Work Measurement: 1.       To determine the  standard cost and  as an aid  preparing bidets. 2.        To balance  the crew activities  of those  job requirin

Scheduling, external factors affecting schedulling

external factors affecting schedulling

Explain increase system transportation costs, A firm that has recently expe...

A firm that has recently experienced an enormous growth rate is seeking to lease a small plant in Memphis, TN; Biloxi, MS; or Birmingham, AL. Prepare an economic analysis of the th

Explain important characteristics of the human service model, What are the ...

What are the 2 most important characteristics of the human service model?

Define critical path, Define Critical Path. Critical Path: Computatio...

Define Critical Path. Critical Path: Computation of Earliest and Latest Values of the events of the specified network is as follows:-  Event              EOT

Assignment, propose process improvement, and justify your reasons for the i...

propose process improvement, and justify your reasons for the improvements, to the flowchart for answering calls

Explain what is the minimum number of workstations output, An assembly line...

An assembly line with a number of tasks is to be balanced. The sum of the task times is 100 minutes. The line will operate for 7 hours per day. What is the minimum number of wor

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd