Explain what is the resulting productivity ratio, Operation Management

Assignment Help:

The total output from a production system in one day is 900 units and the total labor necessary to produce the 900 units is 900 hours. Using the appropriate productivity measure, what is the resulting productivity ratio? 1.000 1.428 0.700 0.411 None of the above


Related Discussions:- Explain what is the resulting productivity ratio

Define customer driven analytic to make managerial decisions, 1) What assum...

1) What assumptions are necessary when using customer driven analytics to make managerial decisions? 2) How does the IT strategy of 7/11 influence other aspects of the business

Determine the standard time, An 8 hours work measurement  study  in a plant...

An 8 hours work measurement  study  in a plant reveals the following : Units  produced= 320 nos. Idle  time = 15%  performance rating-= 120% . allowances  = 12% of normal  time. De

Determine the wbs shown below, Consider the WBS shown below: 1.00.00 1.1...

Consider the WBS shown below: 1.00.00 1.1.0 1.1.1 1.1.2 1.2.0 1.2.1 1.2.2 If the total program costs $100,000 and 1.2.1 and 1.2.2 are each $20 K, then the cost of 1.1.0 is:

Explain market demographics to effectively segment, Measurement of customer...

Measurement of customer engagement through the feedback process helps the organization in all of the following EXCEPT- discover customer perceptions of how well the organization

Explain what type of transmission path, What type of transmission path does...

What type of transmission path does a fixed wireless signal require? a. line-of-sight b. non-line-of-sight c. omni-directional d. code divided

Explain characterize the bacterial and bacterial-like, Characterize the bac...

Characterize the bacterial and bacterial-like STIs, focusing on infectious agents and manifestations

Describe your opinions about executive compensation, 1. Why some employees ...

1. Why some employees entitled to overtime and others are are exempt from being paid overtime? 2. Explain what job sharing is and how it typically works in terms of compensation

Describe when stakeholder identification occurs, Explain when stakeholder i...

Explain when stakeholder identification occurs and explain the importance of stakeholder analysis

Explain design capacity would be needed to achieve, In a job shop, effectiv...

In a job shop, effective capacity is only 49 percent of design capacity, and actual output is 60 percent of effective output. What design capacity would be needed to achieve an act

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd