Explain what is the expected project length, Operation Management

Assignment Help:

Task time estimates for the modification of an assembly line at Jim Goodale's Carbondale, Illinois, factory are as follows-

a) 6.0 -

b) 7.2 -

c) 5.0 a

d) 6.0 b,c

e) 4.5 b,c

f) 7.7 d

g) 4.0 e,f

a) Draw the project network using AON.

b) Identify the critical path.

c) What is the expected project length?


Related Discussions:- Explain what is the expected project length

Explain what is the formula for calculating duration, Answer the following ...

Answer the following questions (use MS Project help if necessary)- Define effort-driven? Under what circumstances would you turn off effort driven scheduling? Use a real-w

Find out the nash equilibrium, In a project, executive and boss are working...

In a project, executive and boss are working together. The executive can be sincere  or insincere, and the Boss can either reward or penalize. The executive gets no advantage for b

Discuss three key problems, In "Consequence Management in the 1995 Sarin At...

In "Consequence Management in the 1995 Sarin Attacks on the Japanese Subway System", what were some of the key problems confronting Japanese first responders to the chemical attack

Explain the basic economic order quantity, The basic Economic Order Quantit...

The basic Economic Order Quantity (EOQ) model can be considered a special case of the Economic Production Quantity (EPQ) model under which of the following condition? Answer The

Explain how many records can be stored per track, 1. Given: a block address...

1. Given: a block addressable disk drive with 4,200 bytes per track and overhead 50 bytes per block. A le contains 50 byte records. How many records can be stored per track if the

Describe any supplementary information needed by pseudocode, 1. Write pseud...

1. Write pseudo code that represents the abstract functions of the enqueue and dequeue operations. Define and explain any supplementary information needed by your pseudo code. 2. R

What are programmed and non-programmed decisions, What are programmed and n...

What are programmed and non-programmed decisions? Programmed decisions are which made in accordance with some procedure, rule or habit. Non-Programmed decisions are those which

Finish a net material requirements schedule, Complete a net material requir...

Complete a net material requirements schedule for: a) All items (10 schedules in all), assuming the requirement for each BOM item is 1. b) All 10 items, assum

Explain legacies of the pharaohs hatshepsut, • Imagine you are an Egyptolog...

• Imagine you are an Egyptologist encountering an astounding archeological find, such as the tomb of Tutankhamen found by Howard Carter in 1922. Would you proceed with the excavati

Explain portfolio management, Portfolio Management" Please respond to the f...

Portfolio Management" Please respond to the following: •From the e-Activity, determine what actions / changes are necessary within the organization to reach the synchronized stage

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd