Explain throw-away prototyping, Software Engineering

Assignment Help:

Throw-away prototyping

Objective:

  • The principal objective of this model is to validate or to derive the system requirements.
  • It is developed to reduce requirement risks.

Advantages

  • Requirement risks are very less.

Problems

  • It can be undocumented.
  • Changes made during the software development proceed may degrade the system

structure.
• Sometimes organizational quality standard may not be strictly applied. 

 


Related Discussions:- Explain throw-away prototyping

Developing prototype software, Introduction Energy consumer in the comp...

Introduction Energy consumer in the computer system is getting critical all around the globe now. Therefore, the ability to figure out the components that consume energy in sys

What is variable trace, 1. "Variable trace" is a (computer) record of the n...

1. "Variable trace" is a (computer) record of the names and the values of variables accessed and/or changed during the implementation of a computer program. 2. "Value trace" is

Frame diagrams, We discussed the importance of framing a problem in order t...

We discussed the importance of framing a problem in order to understand the problem better and be able to develop a solution more quickly and easily. In this homework, you are ask

Iterative Enhancement Model, what is the advantage of Iterative Enhancement...

what is the advantage of Iterative Enhancement Model in developing a system?

Product lines, Product lines Being well-informed about all your company...

Product lines Being well-informed about all your company products and services is necessary for the selling process and to giving good customer service.  A salesperson shoul

Numerical analysis, Use the Newton divided-di_erence method to construct in...

Use the Newton divided-di_erence method to construct interpolating polynomials of degree one, two, and three for the following data. Approximate f(0.18) using each of the polynomia

Software Engineering environments, 1.1 Discuss possible ramifications of th...

1.1 Discuss possible ramifications of these opposing objectives on the project. What would you do if you were the manager?

Explain requirement issues in software risks, Q. Draw the flow chart of Ris...

Q. Draw the flow chart of Risk Management-Activity and explain various Software risks. Ans RISK is a problem that could cause a few loss or threatens the success of the proje

What is ripple effect, What is ripple effect?       The ripple effect i...

What is ripple effect?       The ripple effect is a term used to describe a situation where, like the ever expanding ripples across water when an object is dropped into it, an

Project or process, Mentoring a class at a university. is project or proce...

Mentoring a class at a university. is project or process??

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd