Explain the wetted perimeter, Civil Engineering

Assignment Help:

Explain the Wetted Perimeter

(P) The linear length of the interface between the fluid's cross-sectional plane edges in contact with the pipe or channel wall.


Related Discussions:- Explain the wetted perimeter

Conventional incineration and refuse-derived fuel facilities, Explain the C...

Explain the Conventional Incineration and Refuse-Derived Fuel Facilities? 1. Conventional (Mass-Fired) Incineration most common form of municipal solid waste (MSW) incin

Construction of concrete carriageway, Question If construction of conc...

Question If construction of concrete carriageway is carried out in summer, be capable of expansion joints be omitted? Answer If construction of concrete carriageway

Calculate the most probable value, The most probable value of the following...

The most probable value of the following observations on the same angle (35º 17' 42" ; 35º 17' 38" ; 35º 18' 00" ; 35º 17'; 22"; 35º 17' 42");  is most nearly:   35º 17' 40.8

Horizontal curves - geometric design of roads, Horizontal Curves: Whe...

Horizontal Curves: When a vehicle of mass m moves on a curve of radius R with a speed of v (m/sec) (as shown in Figure 1) it is subjected to a centrifugal force equal to:

Passenger terminal building, Passenger Terminal Building: Importanc...

Passenger Terminal Building: Importance In a civil airport, the passenger terminal building is the centre of all activities. It services both inbound and outward boun

Determine the interdependent phases of investigation, Determine the interde...

Determine the interdependent phases of investigation The following are the interdependent phases of investigation: i)  Stratigraphical survey, ii) Physical survey, and

Properties a water proofing system, Q- Mention 5 essential properties a wat...

Q- Mention 5 essential properties a water proofing system should have? Ans.- water proofing system should have the following essential properties :- a) It should be im

What is a projection line, Projection line is the way, in which the earth i...

Projection line is the way, in which the earth is made known on a flat piece of paper.

Define the predominant factor in atmospheric corrosion, Define the Predomin...

Define the Predominant factor in atmospheric corrosion? The predominant factor in atmospheric corrosion in areas located above splash zone is moisture as there is an excess ava

What do you mean by base fixity, Q. What do you mean by Base fixity? B...

Q. What do you mean by Base fixity? Base fixity When structures such as portal frames are associated to the base foundation, engineers have to determine the degree of fix

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd