Explain the uses of Residual soils
Residual soils may be underlain by sloping rock which may contain weathered seams. The possibility of foundations sliding on these seams have to be considered. In one instance, an eight-storeyed building was constructed on a sloping site containing a weak seam of loose soil sandwiched between layers of quartzite with firm rock below. Footings were provided on the quartzite. When the first five storeys were completed, the building began to move downhill and cracks occurred. The structure was salvaged by providing anchor bars and grouting the footings to the firm rock below. Residual soils require careful treatment to identify firm rock from weathered material.
Blasting Abrasive: Sand had been use widely before new abrasive media invented. Today, manufacturer had more choices and better options in choosing blasting media for their ow
how is varignons theorem useful in engineering mechanics
Determine the deflection of the spring: A close coiled helical spring deflects 25 mm under a certain axial load. Determine the deflection of the second spring under the simila
Find modulus of elasticity of the composite under isostrain: A composite is made of alternate layers of 60% E-glass and 40% epoxy resin. If modulii of elasticity of E-glass an
A machine of mass one tonne is acted upon by an external force of 3000 N at a frequency of 1500 rpm. To reduce the effects of vibration, isolator of rubber having a static deflecti
How is gas cutting torch different from the gas welding torch .explain
Q. Postweld heat treatment? When the equipment data sheet specifies post-weld heat treatment either for service conditions or code requirements, welding, hammering (peening), o
Tyre: Different bikes respond differently to different tyres, so it is impossible to make a generic recommendation. It mainly consists of outer cover and inside tube. The tyre tub
Schedule Evaluation The schedules are evaluated as per to the criterion weighted loss of slack. Now let t 0 si be the slack (time buffer) of job I as per to the initial sched
we can use in proove of energy is a propertyof system we can use (E) instead of (dQ-dW)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd