Q.- Explain the Unit hydrograph Method for estimation of peak flood discharge in a river.
Ans.-
Unit hydrograph Method
A hydrograph is a representation of hydraulic characteristic of river discharge . A point on the hydrograph shows the available discharge at that time . The area under the hydrograph came between any two intervals of time say t1 to t2 shows the volume of water that has passed the measuring point in time t1 to t2.
A concept of unit hydrograph is based on the fact that for a given point in a given stream of a basin the storm of different intensity but of the same unit duration produces hydrograph of surface run off of equal length of time and of the similar shape. The ordinates are proportional to the magnitude of rain fall with the assumption that the rain fall is distributed uniformly over the entire area.
The unit hydrograph is thus defined as the hydrograph which is produced by a rainfall of given duration uniformly distributed over the catchment and which produces a direct run off volume of a unit depth of 1 cm over the entire catchment area.
Hydrograph method consists of constructing a unit hydrograph or distribution graph for the catchment and then by use of given rainfall data, the hydro graph runoff is calculated.
Q. Illustrate the Design discharge for foundation? To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood d
Explain Some Points regarding to Hardness 1) Hardness removal using lime and soda is based on the solubility reactions of calcium carbonate, CaCO 3 and magnesium hydroxide, Mg
what are advantages and disadvantages of barometric levelling
Explain the Interim inspection - underwater inspection of bridge An interim inspection is an inspection scheduled at the discretion of the engineer. An interim inspection is us
Q. Bleeding test for grout – an essential requirement? Bleeding is a form of segregation in that a layer of water migrates to surface of the grout at the time of the initial st
Explain the Non Destructive Inspection Steel/Cast Iron Substructures Some of the structural defects in steel structures may not be visible during visual inspection. In that eve
Q. Differences between pipe jacking and micro-tunnelling? Pipe jacking is a general scheme of installation of pipes with a tunnelling shield in front and the pipes are jacked f
Assignment for marketing mix
Tests on Cement: The following tests are conducted on cement in a project site: Setting Time Initial setting time Final setting time Compressive Streng
what is the actual quantity of water to be mixed in various grade of concrete and also the size of gravel to be mixed with in RCC work. Also I want to know the difference between a
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd