Explain the tertiary treatment for wastewater, Civil Engineering

Assignment Help:

Explain the Tertiary Treatment for Wastewater

Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water bodies), then additional treatment (biological and/or chemical treatment followed by filtration) known as tertiary treatment may be used.

Typical Standards: 10 mg/l BOD5, 10 mg/l suspended solids, 1 mg/l Phosphorous (for effluent discharges into great lakes)


Related Discussions:- Explain the tertiary treatment for wastewater

Unsealed contraction joints in concrete pavement, Unsealed contraction join...

Unsealed contraction joints in concrete pavement For unreinforced concrete pavement, contraction joint is an approximately 3mm wide groove with a depth of about one-third to o

Theodolite, convert whole circle bearing to reduce bearing formula

convert whole circle bearing to reduce bearing formula

Tremie pipes are normally used with aid of hoppers, Question For underw...

Question For underwater concreting, tremie pipes are normally used with aid of hoppers. From time to time tubes are put in inside the hoppers and with reasons? Answer

Strength of materials, An I-section beam 350*200mm2 has a web thickness of ...

An I-section beam 350*200mm2 has a web thickness of 12.5mm & a flange thickness of 25mm. It carries a shearing force of 200KN at a section. Sketch the shear stress distribution acr

Road pavements, Road Pavements: Pavements constitute an important part...

Road Pavements: Pavements constitute an important part of road as they withstand the traffic loads and transmit them to the earthen embankment. A study of the types of pavemen

Mini projects, is there any innovative projects in disaster management ?

is there any innovative projects in disaster management ?

Beam design of multi span fixed support, how can i define cont support beam...

how can i define cont support beam in multi span moment that mean Bending moment

Invoice Method, How to raise an invoice with WCT for Civil construction job...

How to raise an invoice with WCT for Civil construction job?

What do you mean by laying of apron in design of bridge, Q. What do you mea...

Q. What do you mean by Laying of apron in design of bridge? Width of apron laid on river bed should be 1.5 D1 where D 1 is estimated scour depth in metres below river bed. Thi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd