Explain the tertiary treatment for wastewater, Civil Engineering

Assignment Help:

Explain the Tertiary Treatment for Wastewater

Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water bodies), then additional treatment (biological and/or chemical treatment followed by filtration) known as tertiary treatment may be used.

Typical Standards: 10 mg/l BOD5, 10 mg/l suspended solids, 1 mg/l Phosphorous (for effluent discharges into great lakes)


Related Discussions:- Explain the tertiary treatment for wastewater

Geotechnical Engineering, how to calculate the conduct pressure,settlement ...

how to calculate the conduct pressure,settlement e.t.c

Prismatic compass, what is the role of agate cape in prismatic compass?

what is the role of agate cape in prismatic compass?

Measurement of cement and aggregates, Measurement of cement and aggregates ...

Measurement of cement and aggregates - by weight vs. by volume Measurement of constituents for concrete is usually carried out by weight since of the following reasons: (i)

Air traffic control, Air Traffic Control: Importance of Air Traffic...

Air Traffic Control: Importance of Air Traffic Control Air Traffic Control is a system by which routes for flying aircraft are defined, flight rules are framed, and f

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Verify the coefficient of elastic uniform compression, Verify the coefficie...

Verify the coefficient of elastic uniform compression if a vibration test on a concrete block of 1 m cube gave a resonant frequency of 36 Hz in vertical vibration. The weight of

What is meaning of maintenance period, Question If contractor is likely...

Question If contractor is likely for defective works for 12 years with pact under seal, then what is meaning of Maintenance Period? Answer Faulty works constitute a br

Premix road, plz tell me the ratio of sand,aggregate,and asphalt.pl tell me...

plz tell me the ratio of sand,aggregate,and asphalt.pl tell me the mm of aggregate

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd