Explain the term - strength cement, Civil Engineering

Assignment Help:

Explain the term - strength cement

It should be appreciated that the tensioning arrangement shall have to be kept in place until tendons are cut. This shall depend on how quickly the concrete is able to develop strength. High early strength cement with  accelerating admixtures may  be used in concrete to facilitate early strength development and early stripping and reuse of moulds.

 


Related Discussions:- Explain the term - strength cement

Earth dam, earth dam design and its force

earth dam design and its force

Holes in steel plates connecting to H-piles, Q. Holes in steel plates conne...

Q. Holes in steel plates connecting to H-piles There are two types of holes present in the steel plate associated to H-piles in the pile cap. The first type of holes is design

Explain the surface water treatment methods, Explain the Surface Water Trea...

Explain the Surface Water Treatment Methods A. Physical Unit Operations change in water quality is brought about through the application of physical forces screenin

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Matlab, Pls provide matlab design for transportation engg.

Pls provide matlab design for transportation engg.

What are rules for working of dip lorries, Q. What are rules for working of...

Q. What are rules for working of Dip lorries and their protection arrangements on a single line section explain with sketches? Ans.-Rules for working of Dip lorries - i. Sub

Friction dampers, what is friction damper and there types?

what is friction damper and there types?

Verify the magnification and transmitted force, The exciting force in a con...

The exciting force in a constant force type of excitation was 120 kN. The natural frequency of the machine foundation is 4 Hz. The damping factor is 0.36. Verify the magnificati

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd