Explain the term assembler directives, Electrical Engineering

Assignment Help:

Explain the term assembler directives.

An assembler directive is a statement to provide direction to the assembler to execute the task of assembly process. These assembler directives control organization of the program and give essential information to the assembler to understand assembly language programs to produce machine codes. It indicates how an operand or section of a program is to be processed through the assembler. An assembler assists directives to organize segments to control procedures, to define data and to define macros.


Related Discussions:- Explain the term assembler directives

Diac - power semiconductor devices , Diac Diac is a device which  has d...

Diac Diac is a device which  has di electrode  and as its name suggests it works  on AC. The cross  sectional view of a diac is shown if the four layers are PNPN and PNPN .

Clapp oscillator, derivation of frequency of oscillators clapp and derive C...

derivation of frequency of oscillators clapp and derive C effect?

What is a co-processor, What is a co-processor? 8087 NDP (numerical da...

What is a co-processor? 8087 NDP (numerical data processor) is also termed as math co-processor that is used in parallel with the major processor for number crunching applicat

Solid state, What are the fundamentals of solid states?

What are the fundamentals of solid states?

Transformer, how much transformer oil is used in transformers

how much transformer oil is used in transformers

Digital Electronics, Design a MOD-6 synchronous counter using T Flip-Flops....

Design a MOD-6 synchronous counter using T Flip-Flops.

Evaluate the transfer function for multi loop control system, Q. The block ...

Q. The block diagram of Figure represents a multi loop control system. (a) Determine the transfer function C(s)/R(s). (b) For G 2 G 3 H 2 = 1, evaluate C(s)/R(s).

Test schedule - meter testing, Test Schedule - Meter Testing The test ...

Test Schedule - Meter Testing The test schedule as per the Central Electricity Authority Regulations on Installation and Operation of Meters is given below. Table: Test S

Electrical Machine, i have an assignment due for submission within two days...

i have an assignment due for submission within two days. It is all about transformer measurement manually and numerical results using Matlab.Is there anyone can do the job?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd