Explain the rippl diagram or mass diagram, Civil Engineering

Assignment Help:

Explain the Rippl Diagram or Mass Diagram

For a potable water reservoir, it is the simultaneous plots of the cumulative inflow and cumulative water consumption/demand, termed "draft" in units of volume (y-axis) vs. consecutive hours, days, months or years (x- axis). In these types of problems, water demand will be at a constant rate to generate a straight, constant sloped line on the plot.

The cumulative inflow will be a curved plot based on gains and losses to the reservoir. The storage volume needed is the separation between a trough (low point on the plotted curve) and a peak (inputs greater than the demand . At some high point on the plotted curve will indicate when reservoir capacity is full releasing water over the spillway may be necessary.


Related Discussions:- Explain the rippl diagram or mass diagram

To make open sqare &rectangular, how to calculate the section weight for op...

how to calculate the section weight for open square tube

Seasoning of timber, Seasoning of Timber It is a process by which moist...

Seasoning of Timber It is a process by which moisture content in a freshly cut tree is reduced to a appropriate level. The durability of timber is increased by doing so. The se

Explain the terms void ratio, (a) Distinguish among Black cotton soil and L...

(a) Distinguish among Black cotton soil and Laterite from an engineering point of view. (b) Explain the terms 'Void ratio', 'Degree of saturation' and 'Water content', define th

Define the term - prestressing force, Define the term - prestressing force ...

Define the term - prestressing force It should be realized that the maximum amount of prestressing force which can be  transferred from tendons to concrete depends on the bond

Determine the maximum pressure at the base of the wall, A masonry retaining...

A masonry retaining wall of trapezoidal section with the vertical face on the earth side is 1.5 m wide at the top and 3.5 m wide at the base and is 5.0 m high. It retains a sand fi

Closed traverse, closed traverse maths problems at list 5 station

closed traverse maths problems at list 5 station

Cleaning and greasing of steel sliding bearings, Cleaning and greasing of s...

Cleaning and greasing of steel sliding bearings : Following equipments are required for greasing of steel sliding bearings: 1. Jacks (50 ton capacity) - 2 nos. 2. Hard wo

BUILDING CONSTRUCTION, GIVE IN DETAIL THE TREATMENT OF TOP SURFACE OF EARTH...

GIVE IN DETAIL THE TREATMENT OF TOP SURFACE OF EARTH FILLING..

Determine the hydraulic radius for rectangular open channel, Determine the ...

Determine the hydraulic radius R for a rectangular open channel with dimensions of 6 ft wide and 4 ft high (side walls) flowing at a depth of 3 ft. Solution: R = A/P Cross-s

General, hi, im interested in doing engineering after i finish school but i...

hi, im interested in doing engineering after i finish school but im just wondering what is involved in it? im interested in the math side of it and i know there is a certain amount

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd