Assignment Help:

Fireside Tire Company, a manufacturer of radial tires for sport utility vehicles, sells its products in the automotive aftermarket and distribution them throughout the United States. Fireside has three tire production plants located in Allentown, Pennsylvania; Toledo, Ohio; and Macomb, Illinois (see map). Normally, Fireside ships tires from its plants to distribution centres, but truckload-size purchases typically are transported directly from plants to customer locations. All shipments to a region move under truck-load rates applying to a minimum weight of 40,000 pounds, or 400 cwt.

Fireside management is concerned about the most economical location for a distribution center to serve its southeaster region, consisting of North Carolina, South Carolina, Georgia, Florida, Mississippi, Alabama, and southeaster Tennessee. Although an Atlanta distribution center currently serves this region, Fireside management is concerned that the Atlanta location is not the most logistically sound alternative.

To help the logistics department conduct an analysis of this region's distribution center location using the grid method. Fireside's transportation department developed the following data based on projections for 2008:

2008 Shipments to Atlanta Grid Coordinates

From CWT RATE/CWT Mileage Horizontal Vertical

Toledo 15K $2.20 640 1,360 1,160
Macomb 5K $2.43 735 980 1,070
Allentown 11K $2.52 780 1,840 1,150

2008 Shipments From Atlanta Grid Coordinates

TO CWT Horizontal Vertical
Chattanooga 2,700 1,350 650
Atlanta 3,500 1,400 600
Tampa 4,300 1,570 220
Birmingham 2,800 1,260 580
Miami 5,300 1,740 90
Jacksonville 5,100 1,600 450
Columbia 2,200 1,600 650
Charlotte 2,900 1,590 740
Raleigh/Durham 2,200 1,700 800

CAse study Questions
1. Based on the available information is Atlanta the best location for a distribution center to serve the shouteast region? If not, what would you recommend?
2. The Fireside transportation department projects a 25 percent irate increase in 2013 from all of its transportation providers. How will this affect the southeastern location?
3. Marketing anticipates that the raliegh Durham market will grow by 3000 cwt in 2014, and tyhat fireside will serve the growth from Allentown. how will this affect Atlanta as a location?


Related Discussions:- Explain the fireside transportation department projects

Explain inadequate parking, The Manchester United Soccer Tournament project...

The Manchester United Soccer Tournament project team (refer to the Manchester United Soccer club case study in chapter 4 of the text) has identified the following potential risks t

Advantages, what is an advantages of operations management applied to apple...

what is an advantages of operations management applied to apple during the manufacturing of the laser equipment machine?

Describe what specific planning challenges, Someone Help Please! Select one...

Someone Help Please! Select one of the following companies to study in depth over the next 4 weeks. BP Oil Kimberly-Clark Kroger Nucor Walgreens Wells Fargo Kaiser Permanente Ascen

What is the objective under jit and time-based competition, _____ is the ob...

_____ is the objective under JIT and time-based competition. WIP reduction Material velocity Lead-time reduction Decreasing material wait time

Describe main motivational theories described in the text, There are a vari...

There are a variety of theories of motivation, many of which are complementary. Of the main motivational theories described in the text, which theory or theories do you think would

What is a capacity cushion as well why would a firm have one, What is a cap...

What is a capacity cushion and why would a firm have one?

Explain dummy activity, Explain Dummy Activity. Every project has a num...

Explain Dummy Activity. Every project has a number of job operations or tasks that are termed as activities.  An activity is a component of a project and this may be a process,

Describe functions you would include in this sswg, As the System Safety Eng...

As the System Safety Engineer for your firm, you are writing a System Safety Working Group (SSWG) charter. List 6 individuals/functions you would include in this SSWG and the reaso

Explain the planning function of management, Need help with paper for this ...

Need help with paper for this class? Attain faculty approval as you select one of the following organizations: • Global Crossing • Tyco • WorldC

Explain what is the maximum effective capacity of the system, The roller co...

The roller coaster at Treasure Island Amusement Park consists of 15 cars, each of which can carry up to three passengers. According to a time study each run takes 1.5 minutes and t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd