Explain the design criteria for sedimentation basin, Civil Engineering

Assignment Help:

Explain the Design Criteria Sedimentation basin

Surface Loading rate (or overflow rate), Vo = Q/A (flow rate/surface area)

Detention time t or ? = V/Q (Volume /Flow rate)  

Weir loading = Q/L (flow rate/length of weir) ≤ 20,000 gpd/ft

Minimum depth 10 ft and Free Board = 1- 2ft 

Width 30-50 ft and length 100-200 ft with a L:W of 3:1 to 5:1 (4:1 typical) for rectangular basins and diameter of less than 200 ft for circular tanks.

 


Related Discussions:- Explain the design criteria for sedimentation basin

Contour interpolation, given A,B,C,and D are four plotted points at 2 centi...

given A,B,C,and D are four plotted points at 2 centimeter apart and their ground reduced levels are 57.5 meter 63.2 meter 68.2 meter and 59.2 respectively.it is required to draw co

Distomat, short note about characteristics of distomat

short note about characteristics of distomat

Control reinforcement corrosion, Crack width limitation ( In many stand...

Crack width limitation ( In many standards and code of practice of numerous countries, allowable size of crack width is generally limited to less than 0.5mm for reinforced conc

Seminar class, I have a writing that needs to be corrected

I have a writing that needs to be corrected

3 wire leveling, can you give me some examples and problems in 3-wire level...

can you give me some examples and problems in 3-wire leveling?

Surveying, working from whole to part

working from whole to part

What is the design mix concrete, What is the Design Mix concrete Determ...

What is the Design Mix concrete Determination of  the proportions of  cement, aggregates and water to  achieve the required strengths in concrete is made by designing  the  con

Masonry, Sketches for English bond, Stretcher bond, Header bond, Flemish bo...

Sketches for English bond, Stretcher bond, Header bond, Flemish bond in first & second layer plan, elevation and 3 dimensional view of brick bond.

Seive analysis, what is sieve analysis? expalin its procedure.

what is sieve analysis? expalin its procedure.

Inadequate pile founding level, Reasons of common occurrence of "inadequate...

Reasons of common occurrence of "inadequate pile founding level" in piles of piers The most severe load on piers usually is the horizontal load owing to berthing and mooring o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd