Explain the createthread function used in the windows nt, Civil Engineering

Assignment Help:

Explain the CreateThread Function used in the Windows NT

CreateThread(security, size, MyThreadFunction, arg, flag,&tID )

The CreateThread function call is used to start an instance of a Thread and to begin its execution. The developer must pass a security descriptor (security), a stack size (size), start address for the new thread (My ThreadFunction), a 32-bit argument to be passed to the new thread (arg), and create flags (flags). Upon successful initiation of the thread, the threadID will be returned in tID.

It is the responsibility of Windows NT to create, expand, and free the stack for the target thread. A security descriptor may also be passed to the Create function in order to enforce access rules for the thread handle. With Windows NT, the underlying security system can restrict access to handles. If no security descriptors are provided, the handle returned has full access rights. In addition, optional flags allow the thread to be started in a suspended state.


Related Discussions:- Explain the createthread function used in the windows nt

#title beam design, how to calculate loads acting on a simple supported bea...

how to calculate loads acting on a simple supported beam of 220width by 425 depth #Minimum 100 words accepted#

Soil particles for geotechnical design, Question Will it worthwhile to ...

Question Will it worthwhile to take out tests on particle density of soil particles for geotechnical design? Answer Particle density of soils is definite by ratio of

Plane table surveying, plane table surveying is used commonly to survey sma...

plane table surveying is used commonly to survey small areas because

Survey, how to draw longitudinal profile

how to draw longitudinal profile

State the location and spacing of borings, Location and spacing of borings ...

Location and spacing of borings The location, spacing of geophysical profiles, soundings and borings should be such that,  you will be in a position to accurately predict the

Define bank volume to be stockpiled and used for backfill, An earthwork con...

An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building.  The existing grade elevation is 437.5-ft while the sub-base

Edge piles take up more loads than central piles, Edge piles take up more l...

Edge piles take up more loads than central piles in rigid cap Because of the effect of interaction of individual piles, central piles tend to settle more than the edge piles w

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Discontinuity of joint – position of bearing, Q. Discontinuity of joint – p...

Q. Discontinuity of joint – position of bearing? Expansion joints in a bridge structures cater for movements inlongitudinal, transverse, vertical and rotational forms. Layout a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd