Explain the createthread function used in the windows nt, Civil Engineering

Assignment Help:

Explain the CreateThread Function used in the Windows NT

CreateThread(security, size, MyThreadFunction, arg, flag,&tID )

The CreateThread function call is used to start an instance of a Thread and to begin its execution. The developer must pass a security descriptor (security), a stack size (size), start address for the new thread (My ThreadFunction), a 32-bit argument to be passed to the new thread (arg), and create flags (flags). Upon successful initiation of the thread, the threadID will be returned in tID.

It is the responsibility of Windows NT to create, expand, and free the stack for the target thread. A security descriptor may also be passed to the Create function in order to enforce access rules for the thread handle. With Windows NT, the underlying security system can restrict access to handles. If no security descriptors are provided, the handle returned has full access rights. In addition, optional flags allow the thread to be started in a suspended state.


Related Discussions:- Explain the createthread function used in the windows nt

English, Features of literary writing

Features of literary writing

Determine the allowable bearing pressure of the sand, Two load tests were c...

Two load tests were conducted at a site-one with a 0.5 m square test plate and the other with a 1.0 m square test plate. For a settlement of 25 mm, the loads were found to be 60 kN

Assignment help job, Can I apply for "online assignment help job" for civil...

Can I apply for "online assignment help job" for civil engineering,physics & maths etc?

Benchmark, 1. Where permanent bench of india located ? 2. use of Permanent ...

1. Where permanent bench of india located ? 2. use of Permanent BenchMark ?

Surveying land, principle of working from whole to part

principle of working from whole to part

Shape factor, For a solid circular shaft transmitting torque, the shape fac...

For a solid circular shaft transmitting torque, the shape factor is

What are the various types of tiles, Q. What are the various types of tiles...

Q. What are the various types of tiles available in the market for floors and walls? What basic precautions would you take for their laying and choosing the type, colour and siz

Estimate the activity durations - construction management, Estimate the Act...

Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440.  The average crew-hour cost is $15,879 for this

Determine the total head and total pressure of water, Determine the total h...

Determine the total head and total pressure of water flowing at  in a pipe which has the following data: Flow= 2,500 gpm; Elevation = 30 ft; Pressure = 40 psi; Pipe Diameter =

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd