Explain the contracted rectangular weir, Civil Engineering

Assignment Help:

Explain the Contracted Rectangular Weir

Weir plate has sides which extend above the maximum water surface, directing the flow through an opening (b = weir length). Typically the sides are geometrically placed in the center of a rectangular channel.


Related Discussions:- Explain the contracted rectangular weir

REQUIREMENT OF GOOD BUILDING STONE, HOW TO MAKE A GOOD BUILDING .? TELL ABO...

HOW TO MAKE A GOOD BUILDING .? TELL ABOUT SOME TIPS OF REQUIREMENT OF GOOD BUILDING STONE? AND SAY ABOUT CEMENT?

Heat transfer, Three mechanisms: 1) Conduction - occurs in solids and st...

Three mechanisms: 1) Conduction - occurs in solids and stationary fluids (liquids or gases). 2) Convection - occurs in fluids. Change in the buoyancy of the fluid due to its

Preloading - control of settlements, Q. Preloading - Control of settlements...

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

Landing systems, Landing Systems: There are two basic types of landin...

Landing Systems: There are two basic types of landing, viz : (a) visual landing, when the weather conditions are favourable, and (b) instrumented landing, when the weat

Explain terzaghi theory of bearing capacity, a) Explain Terzaghi's theory o...

a) Explain Terzaghi's theory of bearing capacity of shallow strip foundations. Determine the three bearing capacity factors and give their values for  Φ  = 0' case. (b) Descreib

Open channel, design of irrigation channel permissible velocity table

design of irrigation channel permissible velocity table

Calculate the elastic stretch of the steel wire rope, A 70-ft long, ¾" diam...

A 70-ft long, ¾" diameter, 6 x 7 FC wire rope is resisting a tension force of 12-kips.  The elastic stretch of the steel wire rope given the following properties is most nearly: E

How do you measure concrete, We can measure concrete by Cubic feet, Cubic y...

We can measure concrete by Cubic feet, Cubic yards, Cubic Meter

Calculate the uniformly distributed load, Given: pretensioned rectangula...

Given: pretensioned rectangular beam b=6" h=20" f'c=4000psi f'ci=3000psi fti=.165ksi fts=.38ksi fci=1.8ksi fcs=1.8ksi R=0.80 Required: (a)Pi and e to maximize Md+

Show the settlement due to excavation, Q. Show the Settlement due to Excava...

Q. Show the Settlement due to Excavation? If  an excavation is made in a sandy soil,  the structure founded near the excavation will be affected and it will cause extra settlem

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd