Explain the Contracted Rectangular Weir

Weir plate has sides which extend above the maximum water surface, directing the flow through an opening (b = weir length). Typically the sides are geometrically placed in the center of a rectangular channel.


Related Discussions:- Explain the contracted rectangular weir

Define the combustion of solid waste, Define the Combustion of Solid Waste?...

Define the Combustion of Solid Waste? A chemical reaction in which the elements in fuel oxidize in presence of excess oxygen C → CO 2 , H → H 2 O, S   → SO x , N → NO x

Concrete mix proportions, Concrete Mix Proportions Concrete mix proport...

Concrete Mix Proportions Concrete mix proportions should be chosen in such a way that concrete of adequate workability is obtained. Workability of concrete mix should be such t

Abrasion test - tests on stones, Abrasion Test:   This test is carri...

Abrasion Test:   This test is carried out on stones used as aggregates for road construction. The test result shows the suitability of stones against   the grinding action u

Theory of elasticity and plasticity, derivation for strain energy stored in...

derivation for strain energy stored in a body due to torsion

STRUCTURAL MECHANICS, Define and explain Mohr’s theorem for finding slope a...

Define and explain Mohr’s theorem for finding slope and deflection.

Beam stress, what is the bending stress for a simply supported beam with th...

what is the bending stress for a simply supported beam with three equal concentrated loads that are equally spaced?

What do you mean by geotextile filter, Q. What do you mean by Geotextile fi...

Q. What do you mean by Geotextile filter? Geosynthetics is a collective term applied to thin, flexible sheets incorporated in or about soil to enhance its engineering performan

Graphics, 1. Draw the projections of a line AB that is 50 mm long and is pa...

1. Draw the projections of a line AB that is 50 mm long and is parallel to both the HP and the VP. The line is 40 mm above the HP and 25 mm in front of the VP. 2. A line AB, 50 mm

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd