Explain the coefficient of permeability, Civil Engineering

Assignment Help:

A sand deposit of 12 m thick overlies a clay layer. The water table is 3 m below the ground surface. In a field permeability pump-out test, the water is pumped out at a rate of 540 litres per minute when steady state conditions are reached. Two observation wells are located at 18 m and 36 m from the centre of the test well. The depths of the drawdown curve are 1.8 m and 1.5 m respectively for these two wells. Verify the coefficient of permeability

 


Related Discussions:- Explain the coefficient of permeability

Scaffolding, definition for double type scaffolding

definition for double type scaffolding

Plot vertical displacement - cantilever beam, 1. The cantilever beam-like s...

1. The cantilever beam-like structure  shown below is modeled  using  a 2 x 10 mesh of rectangular four-node plane stress elements of equal size. Do the following and compare with

State the total rankine active thrust per metre run, A wall with a smooth v...

A wall with a smooth vertical back 9 m high ropes a purely cohesive soil with  c = 10 kN/m 2 and γ = 18 kN/m 3 . State the total Rankine active thrust per metre run, the positi

Calculate the number of trucks for fleet working, A contractor was awarded ...

A contractor was awarded a Contract to excavate and haul 200,000-yds 3 of silty clay (USCS classification ML) with a bulking factor of 30%.  The contractor's fleet of dump trucks

Trigonometry, #question a pilot entering a bay on course 60.3 degrees at sp...

#question a pilot entering a bay on course 60.3 degrees at speed 12 miles per hour sees a light bearing 37.3 true and 20 minutes later he sees it bearing 20.0 degrees true. if he k

What is rail lubricators, Q. What is Rail Lubricators? 1. P & M type of...

Q. What is Rail Lubricators? 1. P & M type of lubricators - These lubricators can be used for lubrication of FF rails as well as BH rails. 2. Elgi grease pump - Elgi Bucket

Semi elliptical arch, how can i build a semi-elliptical arch out of bricks?...

how can i build a semi-elliptical arch out of bricks?

Curved beams, Sir how can we find location of neutral axis for a curved bea...

Sir how can we find location of neutral axis for a curved beam of circular cross section,,,

Calculate surface loading rate for each clarifier, A wastewater plant is op...

A wastewater plant is operating at 10MGD with a suspended solids concentration of 200mg/L. It has 6 clarifiers operating in parallel. Each clarifier is 40 foot in diameter and 10 f

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!