Explain the Bolted Connections
a) Questions generally relate to the size of the bolt needed for a connection or
b) Number of bolts for a given loading and specified size
c) Shear capacity of bolts is given for single shear connections only. Most common check is for shear in a bearing type connection.
d) The designation of X and N in the table for available bolt strength relates to the threads on the bolt being iN the shear plane (325-N) and not in the shear plane (325-X).
e) The bearing strength at a specific bolt hole typically does not govern a design but must be checked nonetheless.The edge distance from the bolt to the edge of the member in the direction of the applied force is crucial (Lc shown in supplied material).
Q. Explain Foundation design discharge for a bridge? To provide for an adequate margin of safety against any abnormal flood exceeding the design discharge (Q), the foundations,
Q. Can you explain Curved heads ? In case of rivers carrying high discharges of the order of 28300 m 3 Is and above, Gale's recommendations are more conservative than Spring's
Purpose of carrying out water absorption test for precast concrete pipes Cement will mix with more water than is essential to ultimately combine during hydration of cement pas
I need technical assistance. The project is incomplete. I need someone to proofread it. Do you have someone who know Plaxis, Slope/W and Flac?. Can you arrange a case study for Geo
What is the external load acting on a pre-stressed beam In the elastic range, a variation in the external load acting on a pre-stressed beam results in a change in the location
What is DBM?Why use DBM where other binder courses are available?What is composition and advantages of using DBM?
A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day
Q. What are the causes of settlement? The various causes of settlement are: 1) increasing load on the surrounding soil deposit, 2) excavation, 3) lowering of water tab
where we can overlap steel in columns if we use 50 or 60 bar diameter as overlap length.
HIGHWAY TRANSPORTATION: Broadly, there are two classes of roads: (a) Urban, and (b) Rural (Non-urban). Urban roads are those which are located within tow
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd