Explain the bolted connections, Civil Engineering

Assignment Help:

Explain the Bolted Connections

a) Questions generally relate to the size of the bolt needed for a connection or

b) Number of bolts for a given loading and specified size

c) Shear capacity of bolts is given for single shear connections only.  Most common check is for shear in a bearing type connection.

d) The designation of X and N in the table for available bolt strength relates to the threads on the bolt being iN the shear plane (325-N) and not in the shear plane (325-X).

e) The bearing strength at a specific bolt hole typically does not govern a design but must be checked nonetheless.The edge distance from the bolt to the edge of the member in the direction of the applied force is crucial (Lc shown in supplied material).


Related Discussions:- Explain the bolted connections

Projects, GIS AND REMOTE SENSING

GIS AND REMOTE SENSING

Insurance required to be incorporated in deal, Question Is procurement ...

Question Is procurement of third party insurance required to be incorporated in deal for construction works? Answer Purpose of third party insurance is to guard contra

Compare the values of active and passive earth pressures, A retaining wall ...

A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo

Structural Engineering, I want to get help in my Steel Structure Project Th...

I want to get help in my Steel Structure Project Thanks

What do by diaphragm wall, Q. What do by Diaphragm wall? For the constr...

Q. What do by Diaphragm wall? For the construction of diaphragm walls adjacent to buildings, former experience showed that excess slurry head above groundwater level had to be

Temperature requirements for bituminous material, Question In all-purpo...

Question In all-purpose Specification for Civil Engineering Works, it details temperature requirements for bituminous material all through and after mixing. What is cause beh

Continuous beam reaction by equilibrium equation, Solve problem of continu...

Solve problem of continuous beam with equilibrium equation

Manufacturing of cement, describe with neat sketch the process of manufactu...

describe with neat sketch the process of manufacturing of cement in the modern factory by dry process

Modern marketing-integrated marketing communications, Modern marketing call...

Modern marketing calls for more than just developing a good product, pricing it attractively, and making it available to target customers. Companies must also communicate with thei

Determine the in-situ dry unit weight, Q. The following observations were r...

Q. The following observations were recorded in a Field density determination by sand-replacement method: Volume of Calibrating can = 1000 cm3 Weight of empty can = 10 N We

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd