Explain the bolted connections, Civil Engineering

Assignment Help:

Explain the Bolted Connections

a) Questions generally relate to the size of the bolt needed for a connection or

b) Number of bolts for a given loading and specified size

c) Shear capacity of bolts is given for single shear connections only.  Most common check is for shear in a bearing type connection.

d) The designation of X and N in the table for available bolt strength relates to the threads on the bolt being iN the shear plane (325-N) and not in the shear plane (325-X).

e) The bearing strength at a specific bolt hole typically does not govern a design but must be checked nonetheless.The edge distance from the bolt to the edge of the member in the direction of the applied force is crucial (Lc shown in supplied material).


Related Discussions:- Explain the bolted connections

Zones of smear around vertical drains, Zones of smear around vertical drain...

Zones of smear around vertical drains Smear zones are produced during the installation of vertical drains in that zone of soils surrounding the band drains are disturbed. Soil

Example of foundation depth and arrangement, Example of Foundation depth an...

Example of Foundation depth and arrangement: For example, if the maximum discharge of a river is 1000 cu m per sec, and the silt factor is 0.60, the maximum scour depth is :

What is rapid sand filter, Q. What is Rapid Sand Filter? A Rapid Sand F...

Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement

Tests on cement, Tests on Cement: The following tests are conducted o...

Tests on Cement: The following tests are conducted on cement in a project site: Setting Time Initial setting time Final setting time Compressive Streng

Maximum shear stress - state of stress, Maximum shear stress - state of str...

Maximum shear stress - state of stress: Consider the state of stress. (a) According to principal stress theory the equivalent stress for this case is simply σ 1 , i.e. 300

Elimination of formwork with reasons, Question For a l ong slender structur...

Question For a l ong slender structure similar to beams, propping is compulsory after elimination of formwork with reasons? Answer After concreting, time at which arresting of

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd