Explain resultant force on a given area of an inclined plane, Civil Engineering

Assignment Help:

Resultant Force on a Given Area of an Inclined Plane

The resultant force is calculated from the average pressure:   

R = (AVERAGE P)(A)

 

1063_Resultant Force on a Given Area of an Inclined Plane.png

 


Related Discussions:- Explain resultant force on a given area of an inclined plane

Assignment help job, Can I apply for "online assignment help job" for civil...

Can I apply for "online assignment help job" for civil engineering,physics & maths etc?

Define bank volume to be stockpiled and used for backfill, An earthwork con...

An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building.  The existing grade elevation is 437.5-ft while the sub-base

Enthalpy, h = u + pv is a combination of properties and hence must also be ...

h = u + pv is a combination of properties and hence must also be a property.  h is the SPECIFIC ENTHALPY in kJ/kg  H = U + pV is the ENTHALPY in kJ

Explain the classification of solid waste, Explain the Classification of So...

Explain the Classification of Solid Waste  Solid waste can be classified in several different ways.  Putrescible waste - Animal and Vegetable waste From Cooking and

Measure the stress increment, A raft of size 4 m × 4 m carries a uniform lo...

A raft of size 4 m × 4 m carries a uniform load of 200 kN/m 2 . Using the point load approximation with four equivalent point loads, measure the stress increment at a point in the

Raking piles of bridge abutment placed under an embankment, Question It sho...

Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div

Surveying land, principle of working from whole to part

principle of working from whole to part

What is main purpose of swabbing, Question After construction of waterm...

Question After construction of watermain, earlier to hydrostatic pressure test , swabbing is approved out. What is main purpose of swabbing ? Answer Pipelines ha

Determine the project duration and critical path, Critical Path - Activity ...

Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd