Explain procedure to take shut down and to test the power line before starting work?
Ans: Study the circuit and find out the circuit breaker to be opened. Open and lock the circuit breaker and take the key in personnel custody. Disconnect neutral link if available. Hang "Man at Work" notice board on the circuit breaker. Test for supply after making sure that, the testing device itself is OK at the line or equipment . Start the work.
Design a circuit using op-amp that will reject the 60kHz power line noise and also reject high signal frequency above 800Khz. The stop-band width around the 60kHz centre frequency
when MT 2 and Gate is Negative In this case gate current flows through P 2 N 3 junction. Junction N 1 P 2 forward biased hence the triac starts conduction through P
Based upon the following inputs, propose the optimal course of action for this venture: Probability of success: 30%; probability of failure: 30%; base case probability: 40%
Define Gain and Phase Responses? Expressing H(e j? ) in polar form as: H (e j? ) = G (?) e jφ(?) G(?) is the "gain" of the discrete-time system and φ(?) is the "phas
Q. How time slot interchange switch works in time multiplexed time switching, Elucidate using schematic. Ans: Switches for which inlets and outlets are trunks that carry tim
Q. A balanced delta-connected load has a per-phase impedance of 45 60° . It is connected to a three-phase, 208-V, 60-Hz supply by a three- phase feeder that has a per-phase impeda
coding for vehicle tracking system using gsm in avr atmega16 microcontroller
Q. Explain about Half Duplex Transmission? Half Duplex Transmission A half-duplex channel can receive andsend, though not at the same instance. It's like a one-lane bridge w
When the PLC is in the RUN mode it will switch ON the conveyer so it will run continuously. This project is divided into four outcomes: (a) Detect block on entry, close
explain about heat time curve and cool time curve
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd