Explain procedure to test the power line, Electrical Engineering

Assignment Help:

Explain procedure to take shut down and to test the power line before starting work?

Ans: Study the circuit and find out the circuit breaker to be opened. Open and lock the circuit breaker and take the key in personnel custody. Disconnect neutral link if available. Hang "Man at Work" notice board on the circuit breaker. Test for supply after making sure that, the testing device itself is OK at the line or equipment . Start the work.


Related Discussions:- Explain procedure to test the power line

Electromechanical and electronic switching system, Q. Compare electromechan...

Q. Compare electromechanical switching system with electronic switching system. Sr. No Electromechanical switching System Electroni

Signals in noise, Signals in Noise: Let us now consider a weak informat...

Signals in Noise: Let us now consider a weak information signal that is to be amplified by a noisy amplifier. The signal-to-noise ratio (SNR), usually expressed in decibels, be

Magnetic permeability and the definition of the amp, The ampere has been de...

The ampere has been defined (by the International Committee of Weights and Measures in 1946) as the current flowing in two long parallel wires 1 metre apart that produces a force o

Electromechanical energy conversion and device, importance of electromechan...

importance of electromechanical energy conversion and device in electrical engineering

Show transformer equivalent circuits, Q. Show Transformer equivalent circui...

Q. Show Transformer equivalent circuits? Transformers come in various sizes, from very small, weighing only a few ounces, to very large, weighing hundreds of tons. The ratings

Illustrate process characterics of ultrasonic machining, Discribe the ultra...

Discribe the ultrasonic machining with main emphasis on the following (a) Basic working Principle and machining set up (b) Accuracy and surface complete on work materials

Detection and handling of gas leakage, Detection and Handling of Gas Leakag...

Detection and Handling of Gas Leakage : If you are using a toxic gas or have a store for it you must have some devices to indicate the leakage, if any. Though numerous monitoring

Compute the current supplied by the source, Q. A balanced three-phase, wye-...

Q. A balanced three-phase, wye-connected, 2400- V, 60-Hz source supplies two balanced wye- connected loads in parallel. The first draws 15 kVA at 0.8 power factor lagging, and the

Explain various functions of telephone switching systems, Q. Explain variou...

Q. Explain various functions of telephone switching systems. Ans: Functions of telephone switching systems are: (i)  Attending: The system should be continually monito

Give a general account of common drain amplifier, Q. Give a general account...

Q. Give a general account of common drain amplifier? The output is taken over the source terminal and when the dc supply is replaced by its short circuit equivalent, the drain

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd