Explain plate loading test, Civil Engineering

Assignment Help:

Q. Explain Plate loading test?

In general iron plates either 60 cm squares or 75 cm dia and 16 mm thick are used, size of plate should not be less then 1/5th of the width of foundation trench, where the test plate is to be placed on the surface. It is preferably to remove the top 23 cm of natural soil before placing the plate. It is very important to seat the plate accurately over the area and the ground should be leveled as much as possible. The plate should be rotated over the area and any irregularities over the surface trimmed off. The plate should be in contact with the soil over all its area on coarsely grained soil over which are difficult to level accurately. The plate can be seated on the layer of fine dry sand 6 mm thick. The load can be applied to the test plate.

The following methods may be adopted -

Load the soil four times the proposed design load and read settlement every 24 hours until no settlement occurs in 24 hrs. Add 50% more load and read settlement in every 48 hrs until no settlement occurs in 48 hrs. Settlement under the test load should not show more than 20 mm or increment of settlement under test load. If the above limitations are not met, repeat the test with reduced load will be taken for the safe loading capacity of the soil. At least two tests should be carried out preferably with different size of plates.


Related Discussions:- Explain plate loading test

Determine the thickness of flexible pavement layer, Determine the thickness...

Determine the thickness of flexible pavement layer 2 given the following:  FACTS: Total Structural Number required = 7.0 Total number of layers = 2 Layer 1 consists of

Shear force and bending moment, how to draw shear force and bending moment ...

how to draw shear force and bending moment from load intensity

Epoxy-coated bars vs galvanized bars, Bonding performance to concrete: Epox...

Bonding performance to concrete: Epoxy-coated bars vs. galvanized bars  Based on the findings of CEB Bulletin 211 the bonding of galvanized bars to concrete is lower in early

Dams, The regulations and specifications that followed for compaction works...

The regulations and specifications that followed for compaction works for earth dam in Oman

Explain the activitated sludge (aeration tank), Explain the Activitated Slu...

Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p

Maintenance of steel bearings, Q. Maintenance of steel bearings? Cleani...

Q. Maintenance of steel bearings? Cleaning and greasing of bearings is one of the important maintenance works to avoid premature failure of bearings and reduce recurring heavy

Environmental engineering., Solve the following problems and show all steps...

Solve the following problems and show all steps and calculations clearly: 1. A water treatment plant uses a dual media filter. The two media used are: a) Anthracite coal with ef

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd