Explain plate loading test, Civil Engineering

Assignment Help:

Q. Explain Plate loading test?

In general iron plates either 60 cm squares or 75 cm dia and 16 mm thick are used, size of plate should not be less then 1/5th of the width of foundation trench, where the test plate is to be placed on the surface. It is preferably to remove the top 23 cm of natural soil before placing the plate. It is very important to seat the plate accurately over the area and the ground should be leveled as much as possible. The plate should be rotated over the area and any irregularities over the surface trimmed off. The plate should be in contact with the soil over all its area on coarsely grained soil over which are difficult to level accurately. The plate can be seated on the layer of fine dry sand 6 mm thick. The load can be applied to the test plate.

The following methods may be adopted -

Load the soil four times the proposed design load and read settlement every 24 hours until no settlement occurs in 24 hrs. Add 50% more load and read settlement in every 48 hrs until no settlement occurs in 48 hrs. Settlement under the test load should not show more than 20 mm or increment of settlement under test load. If the above limitations are not met, repeat the test with reduced load will be taken for the safe loading capacity of the soil. At least two tests should be carried out preferably with different size of plates.


Related Discussions:- Explain plate loading test

Water-bound macadam road construction for unpaved roads, how can I come up ...

how can I come up with the research on the water bound macadam road construction

Rivet, cold driven rivet

cold driven rivet

Define major ions present in the water, Define Major Ions present in the wa...

Define Major Ions present in the water  Cations:  Calcium, Magnesium, sodium, potassium Anions: Bicorabonate, sulfate, chloride Other ions present: Iron. Manganese, Fluor

Define the highlights of critical path method, Define the Highlights of Cri...

Define the Highlights of Critical Path Method A network analysis technique used to predict project duration by analyzing which sequence of activities has the least amount o

Reverse and direct circulation drill drilling in piling, Q. Reverse and dir...

Q. Reverse and direct circulation drill drilling in piling? For reverse circulation drilling and direct circulation drilling, major difference in drilling method is connected t

Comparison of pre and post-tensioning, Comparison of pre and post-tensionin...

Comparison of pre and post-tensioning A comparison between pre-tensioned and post-tensioned concrete members can be made on the basis of the following considerations. (a) T

Example of magnetic dip, Example : Line AB was drawn with a magnetic ...

Example : Line AB was drawn with a magnetic bearing of 136° 45′ while the magnetic declination was 2° 30′ east In an old map. If magnetic declination is 3° 30′ west to what m

Define truss analysis-stability, Define Truss analysis-stability   ...

Define Truss analysis-stability   Identify whether a truss is determinate or indeterminate. Identify if the truss is stable or unstable   m = number of membe

Construction of passenger terminal building, Construction of Passenger Term...

Construction of Passenger Terminal Building: There are various concepts in planning and constructing passenger terminal buildings. These are : (a)        The international

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd