Explain Numerical Control (N.C) Procedure
a) Process Planning: - This is listing of the sequence of operation to be performed during manufacturing of a part. This as well lists the machine by which the part to be made is routed.
b) Part Programming:-The part programmer is responsible for planning the sequence by N.C system and to document these in a special format.
c) Tape Verification: - The tape is checked for its accuracy. It is checked by two methods. To run the tape through a computer program that will point out the contents of the tape and errors in the tape can thus be checked.
d) Production: - The corrected tape is then used for manufacturing the parts on the N.C machine. The operator loads the raw materials on the machine tool and adjusts the position of the cutting tool relative to workpiece. The N.C system then takes over and machines the part according to the instructions on the tape.
W orking stress and Factor for Safety Working Stress: Working stress is safe stress taken within elastic range of material. For the brittle materials, it is taken equal to
Legal Aspect : Few simple steps to take care of legal aspects of setting up a business are to register your unit with concerned organisation, check out the labour laws that would
The Euler-Poincare Formula The Euler-Poincaré formula describes the relationship of the number of vertices, the number of edges and the number of faces of a manifold. It has b
Q. What do you mean by Contractility? Heart being a muscular pump the ability to eject blood depends on the ability to contract. Another factor is the resistance in the vascula
What is tool economics?
Assumptions in analysis of simple truss: What are assumptions made in analysis of simple truss? Sol.: The assumptions made in finding out forces in the frame are, (1)
Give the assumption of pure torsion derivation of shear stress produced in circular shaft subjected to torsion
Calculate the Length of Developed Blank Part shown in Figure is to be produced from flat sheet by bending operation. Calculate the length of the developed blank. Assume k = 0.
proof of work being a path function
Verband der Automobilindustries Flachenschnittstelle (VDAFS) This interface was developed by the Association of the German Automobile Industry for the transfer of 3-D curves an
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd