Explain National Contingency Plan (NCP)
- Provides detailed direction on the action to be taken at a hazardous waste site, including emergency actions and a method to rank sites to establish future actions
- NCP describes the steps to be taken for the detailed evaluation of the risks associated with a site, termed a remedial investigation(RI). The process of selecting an appropriate remedy is termed the feasibility study(FS).
- Specifies the degree of cleanup to be selected in accordance with several criteria.
- There is no predetermined level of remediation that can be required or that must be achieved at a particular site.
- The degree of correction is established on a site-by-site basis.
- Upon completion and approval of the RI/FS, the preparation of the selected remedy is planned out in the remedial design.
State the use of reinforced concrete The use of reinforced concrete may not solve all the problems. For example, a very long reinforced concrete member, which may be subjected
sample problem
Different type of Stones Stones used for civil engineering works can be classified in the following 3 ways: Geological Physical Chemical
how do one uses the Macauleys model to find deflections of bars
Strength of Concrete at the Transfer Stage Concrete strength in the member at the transfer stage should conform to the design requirements. The frequency of the sampling and t
why
about plane table traversing
Q. Explain Strain compatibility in mini-piles? In designing the axial capacity of mini-piles, grout can be taken into account in the contribution of axial load capacity. Though
Q. Factors determining the stability of a single armour unit There are mostly three major factors that govern the stability of an armour unit, viz gravity, intertangling and s
Design of the Aeration Basin Based on Solids Retention Time - sewer construction: You are provided the following information about a municipal wastewater treatment plant. That
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd