You are the branch operations manager for a leading manufacturing company. The following are the bill of materials (BOM), Master Production Schedule, and Inventory Record Sheet for one of your products.â€
BOM Product: Travel Coffee Cup Item Quantity Required Rubber coaster 1 Handle 1 Insulated insert 1 Exterior cup form 1 Lid 1 Master Production Schedule Travel Coffee Cup Week 1 2 3 4 5 6 600 550 700 475 500 800 Inventory Record Sheet Item On-Hand Balance Lead Time (in weeks) Rubber coaster 75 4 Handle 200 3 Insulated insert 150 7 Exterior cup form 250 1 Lid 100 6
Perform an analysis to determine the appropriate quantities of materials to be ordered or made and the lead time phasing to: Ensure that appropriate quantities of materials are ordered at the appropriate time. Ensure the availability of the materials on hand for production.
Create a report to present the results to your area head. Your analysis should include the following:
What quantity do you recommend? Why? How did you arrive at the appropriate quantity of materials to be ordered or made? What measures do you suggest to ensure that appropriate quantities are ordered at a particular time? How will your measures ensure the availability of the materials on hand for production? How will you account for any wastage? If the demand for a product increases suddenly, how will you account for the sudden need of materials?
A cost estimate for a given project activity is $6,300; this cost estimate does not factor in personal time. Assuming that an allowance for personal time is 9.5%, the total estimat
Using the stakeholder analysis template (appendix B2in the Hilton and Simon text) for a company that you are familiar with, determine the key stakeholder, and categorize them by th
what do you understand by line balancing?what happens if balance does not exist?
Provide an example of a situation when you would use a quantitative data analysis technique. Provide and example of a situation when you would provide a qualitative data analysi
Range - Statistical Aspects of Variability The range is simply the difference between the highest and lowest measurements recorded. Let us say that, in this case, the highest
Determine which features of Canada's labour relations system you would transfer to the U.S. if you could. Explain your rationale.
Fully describe relationship between planning and organizing. Explain how the controlling function does or does not relate significantly to the planning function.
Sales of music stands at Johnny Ho music store in Columbus, Ohio, over the past 10 weeks are shown in the table below. a) Forecast demand for each week, including week 10, using
The owner of a pizza place is considering a new oven in which to bake the pizzas. Oven type A can handle 25 pizzas per hour. The fixed costs associated with oven A are $10,000 and
Computer Aided Layout Planning This method has 3 steps. They are as follow: Preparation phase, Specification phase and Analysis In the preparation p
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd