Explain hot weather patrolling, Civil Engineering

Assignment Help:

Q. Explain Hot weather Patrolling ?

Hot weather Patrolling is done for LWR and CWR tracks when the rail temperature reaches td + 200 C and above and td + 140 C for Central Railway.

Security Patrolling -

Security Patrolling of the specified section is done on special occasions link civil disturbances strikes etc with the object of protect trains against any sabotage etc like tampering of track placing of obstructions on the line etc.

Monsoon Patrolling -

Monsoon night Patrolling is done by Patrolmen in a programmed way on specified sections of the railway track to detect damage done by floods such as breaches settlements.


Related Discussions:- Explain hot weather patrolling

Tests on bitumen, Tests on Bitumen: The following tests are conducted...

Tests on Bitumen: The following tests are conducted on bitumen to find its suitability as a road binder : (a) Penetration test (b) Softening Point test (c) Flash Poi

Urban transport systems, Urban Transport Systems: Urban Transport P...

Urban Transport Systems: Urban Transport Problem Rapid urbanisation is taking place in India. The current urban population proportion of 28 per cent may reach 40 per

Most aggregate size advantage structures, Question Design of concrete struc...

Question Design of concrete structures, normally most aggregate sizes are adopted with scopes from 10mm to 20mm. Does an increase of most aggregate size advantage structures ?

Work study, how activity charts and string diagram use in work study?

how activity charts and string diagram use in work study?

Highway economics, What is highway economics and what are its main contents...

What is highway economics and what are its main contents to study ?

Pumps, largest centrifugal pumps

largest centrifugal pumps

Lime, what is stone lime shall lime and kankar lime

what is stone lime shall lime and kankar lime

Kicker of reinforced concrete cantilever retaining walls, Q. Kicker of rein...

Q. Kicker of reinforced concrete cantilever retaining walls located at the position of largest moment and shear force - why? Generally for reinforced concrete cantilever retai

Determine about the post-tensioned concrete, Determine about the post-tensi...

Determine about the post-tensioned concrete The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling th

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd