Explain fluidized-bed incinerators, Civil Engineering

Assignment Help:

Explain Fluidized-Bed Incinerators

  • sand is heated to 800C by oil or gas and blown around (fluidized) by a blower that sends air from bottom upward
  • heated fluidized sand hits sludge, breaks it apart, and burns it
  • glass and metals must be removed from refuse to incinerated
  • able to burn wastes of widely variable moisture and heat content (i.e. paper and wood)

Related Discussions:- Explain fluidized-bed incinerators

Average heating season outside temperature, Produce a manual determination ...

Produce a manual determination to determine the instantaneous rate of heat loss (kW) through one part of the fabric (eg roof, glazed area, wall) based on an internal building desig

leveling, what are the diff.types of levels used in levlin

what are the diff.types of levels used in levling

Obtain maximum positive moment in a span of continuous beam, Reason of load...

Reason of loading on alternative spans to obtain maximum positive moment in a span of a continuous beam To attain a maximum sagging moment in a span of a continuous beam, gene

Waterway, What is linear waterway?

What is linear waterway?

Compatibility condition, Compatibility Condition: Total strain in ste...

Compatibility Condition: Total strain in steel = Total strain in copper i.e. 3 × 10 -4 + 1.965 × 10 -5 P s   = 4.5 × 10 -4 + 1.8421 × 10 -5 P c Recognising that P

One-way pre stressing vs two-way pre stressing, Q. One-way pre stressing vs...

Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo

Elongation, Elongation of bar due to self weight

Elongation of bar due to self weight

Define collisions - underwater inspection of bridge, Define Collisions - Un...

Define Collisions - Underwater Inspection of Bridge? Structural damage to underwater portions of a bridge can either be collision related or direct result of a collision. Colli

Cross sectional area to be excavate for roadway construction, The Table pro...

The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd 3 ) between section 83+65.6 and 85+98.5 is most n

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd