Explain fluidized-bed incinerators, Civil Engineering

Assignment Help:

Explain Fluidized-Bed Incinerators

  • sand is heated to 800C by oil or gas and blown around (fluidized) by a blower that sends air from bottom upward
  • heated fluidized sand hits sludge, breaks it apart, and burns it
  • glass and metals must be removed from refuse to incinerated
  • able to burn wastes of widely variable moisture and heat content (i.e. paper and wood)

Related Discussions:- Explain fluidized-bed incinerators

Steping footing, What are the types of foundation. With figure

What are the types of foundation. With figure

Define superposition method, Define Superposition Method  1. Remove eno...

Define Superposition Method  1. Remove enough redundant supports to reduce the structure to a statically determinate condition 2. Calculate the deflections at the previous l

Explain about overhauling of level xing, Q. Explain about Overhauling of Le...

Q. Explain about Overhauling of Level xing? Each level crossing except those laid with PSC sleepers must be opened out and the condition of sleepers and fittings, rails and fas

Millennium mills redevelopment project assignment, Millennium mills redevel...

Millennium mills redevelopment project assignment in group Presentation

Soil mechanics, what is the total volume required for the gravel material o...

what is the total volume required for the gravel material of 6.5mx2314mx0.1m with a relative density of 2.919 and a loose bulk density of 1668kg/m3

Show the properties of elastomer, Q. Show the Properties of Elastomer ? ...

Q. Show the Properties of Elastomer ? Though elastomeric bearings offer a number of advantages as compared to steel bearings, many failures have been reported pertaining to the

Prime coat - road pavements, Prime Coat: A prime coat is the applicat...

Prime Coat: A prime coat is the application of a low viscosity binder, usually a bituminous emulsion, to a gravel, WBM or WMM surface, to enable the binder to fill up the voi

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Simply supported steel frame help, I need some help sizing a rectangular pl...

I need some help sizing a rectangular plate that will distribute my load to the simply supported beams below.

Mensuration, My team has to construct a swimming pool at the back of the ho...

My team has to construct a swimming pool at the back of the house. It’s interior dimensions are 10M x 3M and 1M at the shallow end and 2.5M at the deep end. The walls and the bas

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd