Q. Explain Flash Butt welding?
In this process the ends of two rails are kept at fixed distance apart and a mould (designed to suit the rail section ) is fitted on. The rail ends are then heated to yellow red temperature with a blowlamp. A swiveling type crucible containing iron oxide and aluminum powder to match the metallurgical composition of the rails is then ignited and the molten metal is poured into the mould so that the gap between the rail ends is filled up with over flow on all sides. The mould is then removed and excess metal is chipped off from the railhead while still hot. Later it is filed to railhead profile.
Normally it takes 45 minutes to weld a joint but by quick thermit process it can be done in 15 minutes. The joint can be brought into use immediately after welding.
Testing of Aggregates: For use in pavement, road aggregates have to be strong, durable and of good shape. A well-graded aggregates adds to the stability of the layer. The fol
A nearly horizontal, 12 ft wide rectangular channel carries 60 cfs at a depth of 3.0 ft. The width of the channel is smoothly contracted to 6 ft at the downstream section. (a) Dete
what is mean by moment of resistance
Explain the Principle of Working of Shock Transmission Unit? The STU consists of a machined cylinder with a transmission rod that is connected at one end to the structure and a
Question What is function of shear keys in designing of retaining walls ? Answer In formative external constancy of retaining walls, failure modes similar to bearing failure, s
what are the procedure of surveying for sewer projects/
actual meaning of it? Is it a unit to measure the functions of enviroment?
#questiohin..
Bituminous Macadam: Bituminous Macadam (BM) is a base course in which coarse aggregates are mixed with a bituminous binder. The mix is open-graded with 20-25 per cent voids.
Ground Water Levels The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd