Q. Explain Double Bolting?

Where low strength bolts must be used, initial bolting with higher strength low temperature bolts may be necessary to minimize accumulative strain and assure adequate initial seating.

A Closure Data Sheet shall be made for each such joint.

After flange is made up, the high strength bolts are to be removed, one by one, and replaced with new low strength bolts.


Related Discussions:- Explain double bolting

Safety from corrosive chemicals, Q. Safety from Corrosive Chemicals? Sa...

Q. Safety from Corrosive Chemicals? Safety showers and eyewash stations shall be provided in areas where corrosive chemicals are stored and handled. They should be located so t

Determine the critical load, Determine the critical load (W crit ) to ...

Determine the critical load (W crit ) to cause elastic instability of the rigidly jointed frame shown in Figure Q2. The frame members have constant bending stif

Find out moment of inertia, Find out Moment of Inertia: Find out Momen...

Find out Moment of Inertia: Find out Moment of Inertia of an I shaped area around its centroidal axis as illustrated in Figure.  Solution  (i)        The area of

Carburettor tuning of motorcycle, Carburettor Tuning :  It is very importa...

Carburettor Tuning :  It is very important that the carburettor is tuned properly to attain the best fuel efficiency and performance of the motorcycle. Since air screw is factory

What is the combined stiffnes, A competitor in a hill-climb event finds dur...

A competitor in a hill-climb event finds during practice that his car becomes airborne at a particular point on the hill.  Shortly after landing the lowest point in the car just co

Mechanics, what are the angle between two force to make their resultant a m...

what are the angle between two force to make their resultant a minimum and maximum respectively .

Cam-follower, which software can model the conjugate cams-follower?

which software can model the conjugate cams-follower?

Preliminary stress analysis, Preliminary stress analysis work will start ea...

Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd